My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-007167 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1870 Sixth Ave N - 27-118-23-42-0022
>
Septic
>
1995-007167 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:22:22 PM
Creation date
1/16/2019 11:41:48 AM
Metadata
Fields
Template:
x Address Old
House Number
1870
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1870 6th Avenue North
Document Type
Septic
PIN
2711823420022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-� T,ESTING� llr C. Steven B. Schirmers = MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> February 5, 1995 <br /> Philip & Mary Hernandez <br /> 18�� r�, , ^,-� , �r,, <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 2 , four <br /> bedroom home Designed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances . <br /> The soils on this site are a clay loam. A seasonally high water <br /> table was located at 14" to 26" , (mottled soil ) . Due to the <br /> seasonally high water table, a Pressurized Mound System will need <br /> to be installed. The bottom of the rock bed must be located at <br /> least 3 ' above the seasonally high water . <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 4 . 6 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area . <br /> The manifold and supply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod, be sure not to over work. <br /> The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure . A warning device <br /> must be installed with a light and sound device , this is in case of <br /> a pump failure . (mercury floats are a good method) . <br /> All neighboring wells are located greater than 75 ' away from the <br /> proposed treatment area. <br /> CONT ' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.