My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P09606 - demo
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1805 Sixth Ave N - 27-118-23-41-0002/4
>
Permits/Inspections
>
2006-P09606 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:21:35 PM
Creation date
1/16/2019 11:17:20 AM
Metadata
Fields
Template:
x Address Old
House Number
1805
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1805 6th Avenue North
Document Type
Permits/Inspections
PIN
2711823410002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Z_2� -0,6 �D gbol� <br /> , - � -i�=o� <br /> �`5o s° <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (952) 249-4600. <br /> JOB SITE ADDRESS: �O �� �5�� 4� <br /> Occupancy Type: _��Residential Commercial <br /> � / 7" . �%'d'7��J <br /> OWNER S NAM�: -�-��t.l�'G� �fe- Phone: /oZ— S� `�� <br /> Mailing Address: p. City: Q /� <br /> �� `� <<-C�i —7 <br /> C01�1�'RACTOR'SNAME: �- S��r�,S?-�c_�S�Bus.No.: (p la— 5�—�! (P� <br /> Mailing Address: City: �, � <br /> Demolition if planned by means of: manual disassembly <br /> �_heavy equipment <br /> Permits Issued: <br /> # Well Abandonment 1 G��„�,Q,� � � ��� <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> l. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approvaY is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. , <br /> 5. Water wells must be abandoned in accordance with State Health�Department regulations. <br /> 6. Sewer and water must be disconnected at the services at the street by qualified contractors. <br /> 7. Inspection required when all debris has been removed,before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.