My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including designs 2004/2006/2014
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
1570 6th Avenue North - 26-118-23-32-0019
>
Septic
>
septic info including designs 2004/2006/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:17:22 PM
Creation date
1/15/2019 12:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
1570
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1570 6th Avenue North
Document Type
Septic
PIN
2611823320019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. MOUND SLOPE WIDTH 8 LENGTH(Greater than 1%) <br /> 1. Downslope absorption width=absorption width minus rock layer width <br /> 15 feet - 10 feet= 5 feet <br /> 2. Calculate mound size <br /> UPSLOPE <br /> a.Determine depth of Clean sand at upslope edge of rock layer=3 feet minus distance to restricting layer(C1) <br /> 3 ft� - 2.1 ft= 1 feet � <br /> b.Mound height at the upslope edge of rock layer=depth of clean sand for separaGon(G2a) <br /> at upslope edge plus depth of rock layer(1 foot)to depth of cover(1 foot) <br /> 1 ft+1ft+1 ft= 3 feet <br /> c.Upslope berm mul6plier based on land slope(see figure D-34) <br /> Select berm mul6plier of 2.78 <br /> d.Upslope width=berm multiplier(G2c}times upslope mound height(G2b): <br /> 2.78 x 3 ft = 9.0 feet <br /> DOWNSLOPE <br /> e.Drop in elevation=rock layer width(D2)times percent landslope(C5)!100 <br /> 10 ft x 11 % /100= 1.1 feet <br /> f.Downslope mound height=depth of clean sand for slope difference(G2e) <br /> at downslope rock edge plus the mound height at the upslope edge of rock layer(2b) - <br /> 1.10 ft + 3 ft= 4.1 feet <br /> g.Downslope berm multiplier based on percent land slope(see Figure D-34) 5.8 <br /> h.Downslope width=downslope multiplier(G2g)times downslope mound height(G2fl <br /> 5.8 x 4.1 = 24.0 feet <br /> i.Select greater of G1 and G2h as the downslope width 24.0 feet <br /> j.Total mound width is the sum of upslope(G2d)width plus rock layer width(D2)plus downslope width(G2i) � <br /> 9.0 ft+ 10.0 ft+ 24.0 ft= 43.0 feet <br /> k.Total mound length is the sum of upslope width(G2d)plus rock layer length(D3) <br /> plus upsiope width(G2d) <br /> 9.0 ft + 50.0 ft+ 9.0 ft= 68.0 feet <br /> Final Dimensions (slope>1%) 43.0 ft x 68.0 ft <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws <br /> � "(��J (signature) 810 (license#) ��%� i��date) <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.