Laserfiche WebLink
,__._..___.:... <br /> � ��\ <br /> ��'O �'`��,� <br /> '� CITY of OliONO <br /> !; ��� <br /> :; ,� ' �" �;i <br /> ,,,`� �`, G � � Municipal Offices <br /> '� . � • G Street Address: Mailing Address: <br /> �9�E s x p'4�� 2750 Kelley Parkway P.O. Box 66 <br /> `-.. ---.____ O ro no, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner of Address I ��G �� ��f� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is krlown about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes =_�� . <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identi as Non-Compliant <br /> Yes j�6 l� ( �,�t � � �r s/�'�����) �� <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �' <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tanlc(s) were last pumped out on <br /> ��- �'( -d� . The tank(s) should be cleaned through the manhole and <br /> not fluough the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> a• � <br /> Inspectd�,�,1+6'� � Date of Inspection � " d � <br /> '�'elephon� (9j2) 2�9-4600 e �as (9�2)2�9-461� <br /> www.c3.orono.mn.us <br />