Laserfiche WebLink
, i - <br /> '____�\ <br /> ��O�\ CITY OF ORONO <br /> �� SEPTIC SYSTEM APPROVAL <br /> �� � <br /> � �k��T�� " CITY of ORONO <br /> �t ''���M1r' "�� � MunicipalOttices <br /> Y �� ����a/°� � ti Post Office Box 66 <br /> � � .L�;:�`���°4��!"�r CJ Crystal Bay,Miru�esota 55323-0066 <br /> �E�K04/ <br /> \�_ _,- <br /> LOCATION: 15 4 0 S i xth Ave. N. <br /> OWNER: Nancy Howell <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: E. J. Peterson co. <br /> SITE EVALUATOR: S-P Testing REpORT DATE: July 24, 1993 <br /> The City of Orono has Approved your on-site system design as of September 8, 199 3 <br /> (approved-disapproved) (date) <br /> with the following comments: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. I <br /> CITY OF ORONO <br /> �� <br /> By <br /> Stephe eckman, On-site Systems Manager <br /> TELEPHONE—473-7357� FAX-473-05 l0 <br />