Laserfiche WebLink
:--.._� <br /> 7' � '�� � <br /> �'�� o �'. <br /> ���� � ������`, CITY of UIZONO <br /> �i � �.. ��r <br /> '�� � �, �, ,�+ Municipal Offices <br /> ;: � � , <br /> '� � ', ' � G � Street Address: Mailing Address: <br /> ��k E s K p4�� 2750 Kelley Parkway P.O. Box 66 <br /> ' Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address � -� `�� 5�� '�'�"�"� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31,2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> �es �No <br /> The City recommends the septic tank(s) and/or lift tanlc be serviced and pumped <br /> out every three,years. City records indicate the tank(s) were last pumped out on <br /> �`] -l�a ' CJ� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> Inspec w F Date of Iiispection � �- � � <br /> ��� <br /> �'elep�aor�e (9�2) 2�9-�d6�� � �'ax(9;�)2a9-�61� <br /> W'Y6'b1'.C I.0�'063 O.Y3'171.U S <br />