My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00165 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1480 Sixth Ave N- 26-118-23-32-0008
>
Permits/Inspections
>
2010-00165 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:17:03 PM
Creation date
1/14/2019 12:46:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1480
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1480 6th Avenue North
Document Type
Permits/Inspections
PIN
2611823320008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . • <br /> Plan Review Checklist for New Structures / Additions <br /> Address/ PID/ Legal: l�l�C� �v n�r�j �A/� �j <br /> Description of work: �f�T1-1 � 'yv��0(:Z <br /> Septic review by: N/l� Date Approved: <br /> Zoning review by: 14 Date Approved: <br /> Building review by: ��C. Date Approved: �� -ZZ- I d <br /> Grading review by: /J�� Date Approved: <br /> Zo ing File#: Resolution#: Resolution Date: <br /> Zonin District Fire De artment Post O�ce Scho District <br /> Zoning: Lot Area: SF/AC Width: pth: <br /> Survey Submitted: � Yes � No Date of Survey: <br /> Pro osed Setbacks: <br /> Front(Lake) Rear treet) ( N S E W ) ( N S E W ) ther Buildings Wetland <br /> Side Side <br /> Building Defined Height: Building Peak Height: #of Stories Ok?: � YES <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SP E: FOR BUILDING ON A SLAB FOUNDATION: <br /> START WITH the distance between the basement or/crawl S ART the distance between the slab and the highest <br /> space floor and the highest roof peak,t top of ITH roof peak,the top of the cornice of a flat roof, <br /> the comice of a flat roof,the deck line of a the deck line of a mansard roof,or the <br /> mansard roof,or the uppermost point on a ro d uppermost point on a round or other arch-type <br /> or other arch- e roof roof <br /> SUBTRACT half the distance between the highest window an SUBTRACT half the distance between the highest window <br /> hi hest roof eak of a itched roof and hi hest roof eak of a itched roof <br /> SUBTRACT the distance between the basement floor/cr I ADD the distance between the slab and the highest <br /> space floor and the highest existing grade ithin existin rade within the foundation <br /> the foundation or 10 feet,whichever is le . E ALS Defined buildin hei ht <br /> EQUALS Defined buildin hei ht <br /> Lot Coverage: F % <br /> Shoreland District MCWD Pe it Received Avera e Lake ore Setback Bluff <br /> � Yes . No � N/A � Yes 0 No <br /> 0 Yes 0 No 0 Yes � No 0 N/A <br /> Permit N mber: Setback: <br /> Hardcover Zones Exi in Pro osed Variance Re uired CUP Re uired <br /> 0-75' 0 Yes 0 No � Yes � No <br /> 75-250' Type(s): T e(s): <br /> 250-500' <br /> 500-1000' <br /> REMARKS (in-hou ): <br /> Upd ted: 09/11/2009 <br /> z:�fo slplan review checklist.doac <br />
The URL can be used to link to this page
Your browser does not support the video tag.