My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11370 - septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1330 Sxith Ave N - 26-118-23-31-0010
>
Septic
>
2007-P11370 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:35 PM
Creation date
1/10/2019 1:06:52 PM
Metadata
Fields
Template:
x Address Old
House Number
1330
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
1330 6th Avenue North
Document Type
Septic
PIN
2611823310010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> � ' • � ' ' ' , <br /> A DIVISION OF WRM SERVICES ING Kt��.l.,MN 55353 <br /> (320)398-2705 <br /> May 25,2007 <br /> Wallace�ohach <br /> 1330 Ca Road#b <br /> Long Lake,MN 55356 <br /> RE: Septic System Design for 1330 County Road#6,Orono,Minnesota. <br /> As per your request,an onsite wastewater treatrnent system has been designed for the referenced <br /> property. It is our understanding that your existing system is non-compliant and you wish to upgrade it. <br /> The property was evaluated for it potential to suppo�t a standard septic system but due to steep sio�s, <br /> limited space with undisturbed soils and a high seasonal watertable no area could be found to support <br /> such a system. Therefore a performance type septic system has been designed in general accordance <br /> with Minnesota Rule Chapter 7080. <br /> The system will consist of a 1300 gallon trash trap/multi flo dosing tank,a 600 gallon multi flo <br /> treatment plant,a 1300 gallon bed dosing tank and a 900 squaze foot raised pressure bed. Due to the <br /> topography in the area best suitable for the dispersal field,a reta.ining wall will need to be constructed <br /> around the easterly side of dispersal field. <br /> Soil borings were completed on the property and revealed disturbed(cut&fill)soils in the area of the <br /> existing drainfield and the south and easterly side slope of the large hill in the back yard. 1'he depth to <br /> the seasonal watertable ranged from 20"to 42"below the ground surface in the area of the proposed <br /> dispersal field. Based on the three soil borings in the area of the dispersal fieid,soil boring#7 had the <br /> . highest seasonal watertable which was found to be at an elevation of 108.1. With the bottom of the <br /> proposed dispersal field media being at an elevation of 109.6 the dispersai field will have atleastl8"of <br /> vertical separation from the seasonal watertsble. <br /> This system will require semi annual monitoring,sampling and service to ensure it is working properly. <br /> For frequencies of monitoring and sampling refer to the monitoring plan attached. Maintenance of the <br /> system is to be completed as per the manufactiu�es recommendations. Also attached is a mitigation plan. <br /> This plan lays out recommendations to foliow if the systcm or a portion of the system fails or dces not <br /> work properly. A water meter will also need to be installed in the house as per state codes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.