Laserfiche WebLink
� _ � � � ����� � � e <br /> � J � <br /> � <br /> O,�:\ . <br /> O O <br /> � <br /> . r�:, �, C ITY of ORONO <br /> `� c ,ti�' .`> ti Municipal Offices <br /> �� \ � 't�G~' Street Address: Mailing Address: <br /> �9�CEggO�'.%� 2750 Kelley Parkway P.O. Box 66 <br /> -- "� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> I�larch 13, 2003 <br /> Dear Nei jhborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Lon� Lake East neighborhood. This project consists of <br /> directional boring a pressure sewer line north of the existing houses, and the pro��ision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to your property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There mati-also be minimal <br /> disturbance in the areas whcre the contractor sets up the directional boring machine. All <br /> disturbed areas will be restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the sewer is not required, but the system�vill be available for future hookup upon <br /> payment of a connection fee. The current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Service Availability Charge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> se�ver capacity that is included in the metropolitan interceptor sewers and�vaste�z-ater treatment <br /> plants for future sewer connections. This is a pressure sewer system, and each property o�vner is <br /> required to install, operate, and maintain their o�vn private residential grinder pump station. <br /> The City will need to acquire a 20-:oot�`�ide permanent se��-er easement acro�s y�our property for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allo�v access on your property to complete the project construction. After the se«�er is <br /> installed, the exact pipe location��zll be surveyed and a legal description developed for an <br /> easement document. <br /> Page 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />