My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
sewer info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
1305 Sixth Ave N - 26-118-23-34-0004
>
Correspondence
>
sewer info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:19 PM
Creation date
1/10/2019 12:44:51 PM
Metadata
Fields
Template:
x Address Old
House Number
780
Street Name
Long Bridge
Street Type
Lane
Address
780 Long Bridge Lane
Document Type
Correspondence
PIN
2611823340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ � � � ����� � � e <br /> � J � <br /> � <br /> O,�:\ . <br /> O O <br /> � <br /> . r�:, �, C ITY of ORONO <br /> `� c ,ti�' .`> ti Municipal Offices <br /> �� \ � 't�G~' Street Address: Mailing Address: <br /> �9�CEggO�'.%� 2750 Kelley Parkway P.O. Box 66 <br /> -- "� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> I�larch 13, 2003 <br /> Dear Nei jhborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Lon� Lake East neighborhood. This project consists of <br /> directional boring a pressure sewer line north of the existing houses, and the pro��ision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to your property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There mati-also be minimal <br /> disturbance in the areas whcre the contractor sets up the directional boring machine. All <br /> disturbed areas will be restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the sewer is not required, but the system�vill be available for future hookup upon <br /> payment of a connection fee. The current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Service Availability Charge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> se�ver capacity that is included in the metropolitan interceptor sewers and�vaste�z-ater treatment <br /> plants for future sewer connections. This is a pressure sewer system, and each property o�vner is <br /> required to install, operate, and maintain their o�vn private residential grinder pump station. <br /> The City will need to acquire a 20-:oot�`�ide permanent se��-er easement acro�s y�our property for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allo�v access on your property to complete the project construction. After the se«�er is <br /> installed, the exact pipe location��zll be surveyed and a legal description developed for an <br /> easement document. <br /> Page 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.