Laserfiche WebLink
� t <br /> , �, <br /> l � � � S \��� �L�e �1 <br /> � <br /> 0,�:��; <br /> O O <br /> . : t;�,:. �, CITY of ORONO <br /> � � �' .>� ,�ti Municipal Offices <br /> '� � � i�� ''``"` G,�; <br /> � ' .�,;� Street Address: Mailing Rddress: <br /> '�-`q�CEggO�'%� 2750 Kelley Parkway P.O. Box 66 <br /> - � Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> I�larch 13, 2003 <br /> Dear Neighborhood Residents; <br /> The City of Orono has selected a directional boring contractor to complete the pressure sewer <br /> installation project in the North Long Lake East neighborhood. This project consists of <br /> directional boring a pressure se�ver line north of the existing houses, and the provision of a <br /> service stub for each house. Directional boring of the sewer should result in minimal disturbance <br /> to y�our property. The only excavations required will be at the service stub, and flushing <br /> connection stations. These locations are circled on the attached plans. There may� also be minimal <br /> disturnance in the areas where the contractor sets up the directional boring machine. All <br /> disturbed areas will be restored as part of this project. The project schedule is to have the sewer <br /> installed by June 1 st. <br /> Connection to the sewer is not required, but the system will be available for future hookup upon <br /> payment of a connection fee. �I'he current connection fee is $11,000 per unit. This connection fee <br /> is updated each year to account for inflationary increases. In addition to the City connection fee, <br /> there is also a Service Availability Ch�rge (SAC) fee that is collected by the City then remitted to <br /> the Metropolitan Council Environmental Services. This fee covers the capital costs for additional <br /> se���er capacity that is included in the metropolitan interceptor sewers and wastewater treatment <br /> plants for h.rture sew-er connections. This is a pressure sewer system, and each property owner is <br /> required to install, operate, and maintain their own private residential grinder pump station. <br /> The City will need to acquire a 20-:oot wide permanent sewer easement acro�s your properiy for <br /> the installation and future maintenance of the sewer. We would like to obtain a "Right of Entry" <br /> to allow access on your property to complete the project construction. After the sewer is <br /> installed, the exact pipe location ��ill be surveyed and a legal description developed for an <br /> easement document. <br /> Page 1 of 2 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />