Laserfiche WebLink
� i. � <br /> C HAMBERS <br /> ., <br /> DIANNIt�G SPRWG H[LL TRAlN1NG FACILITY <br /> - ARCN�TECTURE <br /> INTERIOR OESIGN PROJECT LOCATION: 725 6T"Avenue North <br /> PuacHas�N� DATE&TIME: December 08,2015 <br /> Re:Spring Hill Training Facility load calculation and exit calculation. <br /> Roger Peitso <br /> Building Official <br /> City of Orono <br /> Below are the requested calculations for the Spring Hill Training Facility. <br /> Business Group B(Section 304.1 IBC) <br /> Training and skills development not within a school or academic program. <br /> Occupant load calculation per room: <br /> Studio#1- 1 teacher, 1 student=2 occupants max. <br /> Studio#2- 1 teacher, 1 student=2 occupants max. <br /> Studio#3-1 teacher, l student=2 occupants max. <br /> Office-1 occupant <br /> Club Repair Room-1 occupant <br /> Great Room (Putting Green)=3 occupants max <br /> Great Room (Lounge Area)=4 occupants <br /> Total calculated occupant load=l5 Occupants <br /> Exit Requirements(Section 1005.1 IBC) <br /> Minimum required-1 exit with a minimum width of 32 inches. <br /> Proposing-2 exits 35 inches wide each. <br /> Minimum number of required plumbing fixtures(Table 2902.1 IBC) <br /> Minimum required- 1 water closet per first 25 occupants, 1 lavatory per first 40 <br /> � occupants and 1 drinking fountain per 100 occupants. <br /> Proposing-1 water closet, l lavatory and 1 drinking fountain. <br /> � If you have any questions regarding this letter please feel free to contact us at any time. <br /> Thank you, <br /> Chambers <br /> I800 Washington Boultvard•Suite 111 <br /> Baltfmore AAaryland 2Q30 USA 4W.727.4535 <br /> CHAMBER5USA.COM <br />