Laserfiche WebLink
� <br /> Roger Peitso <br /> From: Roger Peitso <br /> Sent: Monday, December 07, 2015 2:50 PM <br /> To: 'Tim Johnson' <br /> Cc: Jeremy Barnhart <br /> Subject: RE: Training Facility <br /> Tim, <br /> Sorry about the 2"d email I have just read the architects email,we need to address these points from my review letter. <br /> 2. I do not have page A2.10 in the documents provided for review as well as the civil plans as I stated in my first e-mail. <br /> 4. I will attach a copy of the specifications for the accessible parking sign to the plans. It appears I did not state my <br /> request so it would be understood,we still need the location of the sign. <br /> 6. I don't have an amended hard copy of the page A3.20 I will attach 8.5 X11 copies of the changes to the plans. <br /> I received the hardware specifications, it looks like there will be a thumb turn for the front door.This door will need to <br /> be labeled with 1" high contrasting lettering"THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED" <br /> Please provide hard copies of all missing pages. 2 full size sets and 1 set 11X17. <br /> Any questions please don't hesitate to call. <br /> Thanks, <br /> Roger <br /> From:Tim Johnson [mailto:timj@springhillgc.com] <br /> Sent: Friday, December 04, 2015 9:48 AM <br /> To: Roger Peitso<rpeitso@ci.orono.mn.us>; 'Dick Heise'<dheise@chambersusa.com>; Ryan Barth <br /> <rmbbuildersllc@gmail.com> <br /> Subject: RE:Training Facility <br /> Roger, <br /> Please review the response and detail from our Architect addressing your questions. Additionally, I included our <br /> projected use summary that we presented to The City of Orono to address the bathroom and building use. Not <br /> addressed in the Architects response are the following: <br /> 1) Onsite Inspection of Materials-Will be completed by Braun Intertec, Minneapolis. http://braunintertec.com <br /> 4) Accessible signage, location-Our plan was to use a D9-6, 18"x18" placed in the location shown on page 7 of the <br /> Civil plans that you have. We are willing to use whatever signage the City of Orono would request. <br /> 5) Emergency Lighting is reflected in the plan. We currently use Nardini Fire Equipment at the clubhouse location <br /> for supply and annual testing. <br /> They have our floor plan and have been hired to install and maintain the equipment in the practice building. <br /> 7) All subcontractors are aware of required permits. <br /> If you need any further information, please feel free to contact me or arry of our construction team members. <br /> 1 <br />