My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01463 - septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0725 Sixth Ave N - 26-118-23-44-0006 Spring Hill Golf
>
Septic
>
2015-01463 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:11 PM
Creation date
1/9/2019 11:41:57 AM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
725 6th Avenue North
Document Type
Septic
PIN
2611823440006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i , � <br /> f � <br /> • � � SP TESTING INC. <br /> Steven B.Schirmers —951 Katydid Lane NE—St.Michael,MN 55376 <br /> Cert.No 627 — State License#394 — Phone 763-497-3566 — Fax 763-497-5011 <br /> www.satestin�.wastewaterCa�comcast.net— schirmerswastewater.com <br /> . <br /> RECE�VED <br /> . <br /> March 19, 2015 NOV 12 2015 <br /> Spring Hill Golf Club <br /> C�N OF ORONO <br /> Training Center <br /> 725 Co. Rd. 6 <br /> Orono, MN <br /> This letter is in regard with a design for holding tanks for this facility. The <br /> proposal is for 20 students/week with a maximum of 30 students in the future at <br /> 5 gal/each totaling 150 gal/week& 1 instructor/day at S gal/session = 5 gal x 30 = <br /> 150 gal/week with a total water use of 300 gal/week. This also includes 5 gal/user <br /> for facility cleaning. <br /> The holding tanks will be 2-1500 gallon tanks with the top of the tanks &4' down <br /> the sides insulated. An outdoor alarm— light & indoor alarm will be needed. The <br /> alarm will be set at 900 gallon capacity in the 2"d tank allowing 600 gallons reserve <br /> storage after the alarm. <br /> A contract is required at all times with a licensed pumper. <br /> Insulate the supply line with a cleanout at the building & to 50' from the building. <br /> . The finished floor of the building will be at elevation 1031.0. The flow line at the <br /> building is approximately 1029.0. The tanks will be at ground elev. 1024.0 &the <br /> top of the tanks at elev. 1022.0 with the flow (ine inlet at elev. 1021.3 <br /> Steven B. Schirmers <br />
The URL can be used to link to this page
Your browser does not support the video tag.