My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MN wetland Conservation act notice of decision
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0725 Sixth Ave N - 26-118-23-44-0006 Spring Hill Golf
>
Misc
>
MN wetland Conservation act notice of decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:13 PM
Creation date
1/9/2019 10:43:17 AM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
725 6th Avenue North
Document Type
Misc
PIN
2611823440006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, L <br /> 1 , � Graham Environmental Services, Inc. S1095 Westland Drive <br /> � � Spring Valley, WI 54767 <br /> Phone: 715-778-5730/888-279-2070 <br /> ����' Fax: 715-778-5867/888-279-2069 <br /> Memorandum <br /> TO: Catherine Bach <br /> FROM: Mike Graham�-� � <br /> DATE: June 20, 2012 <br /> SUBJECT: Spring Hill Golf Club Sequencing Application <br /> Catherine, <br /> Since our meeting of June 4, 2012 with yourself and other members of the Technical <br /> Evaluation Panel (TEP), we have completed additional information for the TEP's <br /> consideration of sequencing flexibility(Minn. Rules 8420.0520 Subp. 7a) for the wetland <br /> impacts proposed as part of improvements to the 13�' hole at Spring Hill Golf Club. <br /> Specifically, we have completed MnRAM analyses for the entire wetland complex on the <br /> site (referenced as Wetland 15 in old permit documents), the proposed north impact <br /> site, the proposed south impact site, and the proposed on-site mitigation wetland. The <br /> consultant for the wetland bank proposed to be used for the remaining mitigation <br /> requirement has completed a MnRAM analysis for the wetland bank. <br /> Based upon the MCWD's policy of desiring wetland mitigation within the watershed <br /> district, Spring Hill has proposed to provide what mitigation it can on the site which <br /> would be adjacent to the proposed south wetland fill area. Space within the golf course <br /> is limited and, as this would be a wetland "creation", only up to seventy-five percent of <br /> the new wetland area on the site would be eligible for wetland credit and the required <br /> finrenty-five foot average upland buffer(per WCA) would likely qualify for up to twenty- <br /> five percent credit. For these reasons, Spring Hill proposes to purchase approximately <br /> one-half of the required mitigation credit from a wetland bank (see below). <br /> Revised Wetland Imqact <br /> Since our June 4 meeting, Spring Hill has modified its plans which would reduce the <br /> amount of proposed wetland impact in both the north and south fill areas. In the north <br /> fill area, the proposed earthen bridge has been deleted from the plan and the existing <br /> span bridge will be reconstructed or replaced to address the maintenance and safety <br /> issues discussed in GES, Inc.'s March 30, 2012 Sequencing Application document. <br /> Based on preliminary grading plans, the north wetland fill area would cover 15,568 <br /> square feet (0.36 acres) as opposed to the 20,600 square feet (0.47 acres) originally <br /> proposed. <br /> . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.