My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: inspection of fire alarm system
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
0725 Sixth Ave N - 26-118-23-44-0006 Spring Hill Golf
>
Correspondence
>
Re: inspection of fire alarm system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:26 PM
Creation date
1/9/2019 10:12:35 AM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
725 6th Avenue North
Document Type
Correspondence
PIN
2611823440006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> 2405 ANNAPOLIS LANE <br /> MINNEAPOLIS, MN 55441 <br /> MONITORING 612-553-1180 <br /> SYSTEMS, INC. <br /> Name of Property ^ �'�t Report # �-� <br /> Property Address n , <br /> Receiving Station Notified ,�es no Time ' ,a � Date /v -i z- 9 ( <br /> Receiving Station Phone # ����-705�� Contact Person <br /> i <br /> 1. Equipment manufactured by G✓�.p-y W� �t Model # Serial # <br /> 2. Is control panel free of dust and dirt? (yes) no) <br /> 3. Is AC power on? (yes) (no) <br /> 4. Do control panel switches work correctly? (yes) (no) <br /> 5. Type of batteries - Size �-/�-V. (�e�/S , Amp Hours �� v <br /> 6. Are battery contacts clean? (yes) (no) <br /> 7. If dry cells, were they replaced? (yes) (no) <br /> 8. If trickle charged, charge voltage is o7�• � at �� � � ohms load <br /> 9. Battery test voltage is �.y��, �i under y��, / load <br /> 10. Are there any abnormal conditions when transferring from AC power to <br /> battery standby? (yes) �g„�,� <br /> 11. If yes, list problem <br /> 12. Is AC power supplied with a lock off device? (yes) <br /> 13. A.) Does system have a trouble light? (yes) (no) <br /> B.) Does trouble light work correctly? (yes) (no) <br /> 14. A.) Does system have an audible trouble device? (yes) (no) <br /> B.) Does audible trouble device work correctly? (yes) (no) <br /> 15. A.) Are the system's circuits electrically supervised? (yes) (no) <br /> B.) Does system's supervision work correctly? (yes) (no) <br /> 16. A.) Zs AC power supervised? (yes) (no) <br /> B.) Does AC power's supervision work correctly? (yes) (no) <br /> 17. A.) Is DC power supervised? (yes) (no) <br /> B.) Does DC power's supervision work correctly? (yes) (no) <br /> 18. System Initiating Devices <br /> Cleaning and <br /> When tested sends signal maintenance <br /> List below type Restorable or Now tested appropriately and/or performed <br /> of alarm initiating unrestorable ref. NFPA 72E properly activates aux. according to <br /> uan. device t pe Chapter 8 equipment NFPA 72E-Describe <br /> �3 � s �o ,. e S Sn'�ol�-e� Yes ( k) No ( ) NA ( ) <br /> .Z '�ta.�Fi o C� w��e Yes ( No O NA O <br /> tc. �.,'S �r,�o�c-�- Yes No ( ) NA ( ) <br /> `:6 � Oc ,� !;; Yes ( ) No ( ) NA ( ) <br /> Yes ( ) No ( ) NA ( ) <br /> Yes ( ) No ( ) NA ( ) <br /> Yes ( ) No ( ) NA ( ) <br /> Yes ( ) No ( ) NA ( ) <br /> 19. Other tests as required by equipment manufacturers: <br /> 20. Are all alarm initiating devices in good condition, unobstructed, free <br /> of damage or corrosion? (yes) (no) <br /> 21. Are all alarm initiating devices LISTED equipment, for the purpose they <br /> are being used? (yes) (no) <br /> 22. Are there any recent changes to the structure that require additional <br /> protection? (yes) (� <br /> 23. Are there any local detection devices independent of the automatic alarm <br /> system? (yes) no) <br /> 24. A.) If yes to 20, how many were tested? ��lO <br /> B.) Were they all working correctly? (yes) no <br /> C.) List type of cleaning and maintenance performed <br /> 25. Is wiring properly supported and in good condition? (yes) (no) <br /> 26. A.) ?^]here conduit is used, are solid connections made? (yes) (no) <br /> B.) Is conduit properly supported? � , (yes) � (no) <br /> 27. Does system signal local (X ) central station (�:� propri tory O <br /> 28. If central or porprietory, were signals corr�ctly received? ��yes (no) <br />
The URL can be used to link to this page
Your browser does not support the video tag.