My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-02-2018 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
2010-2019
>
2018
>
01-02-2018 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 9:09:16 AM
Creation date
1/9/2019 9:09:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PARK COMMISSION <br /> Tuesday,January 2,2018 <br /> 6:30 o'clock p.m. <br /> Ongoing Projects <br /> Park Project Scope of Work <br /> Saga Hills Saga Hills Restoration Project Place benches(aka sitting stones), complete tree <br /> trimming, remove debris piles, erect signs <br /> Lurton Park Lurton Park Establish permanent Porta-Potty location, <br /> vegetation restoration <br /> All Parks and Open Space Rewrite the parks and open space chapter <br /> Comprehensive Plan update <br /> 2018 Projects <br /> Park Project Scope of Work <br /> Bederwood Improvement/Planning Support Park Commission's preparation of a <br /> conceptual plan with cost estimates for <br /> improvements to the park and execute if approved <br /> and time permits <br /> Golf Course Porch/Patio Includes porch for clubhouse <br /> Golf Course Cart Parking Run concurrent with porch project as the porch <br /> project eliminates current cart parking. Includes <br /> retaining wall and pavement for cart parking. <br /> Golf Course Fest Tent Area Leveling and clearing a 40' x 60' area for <br /> placement of a fest tent to facilitate more events at <br /> the golf course <br /> Golf Course Clubhouse foundation sealing Evaluate the foundation and seal. This project <br /> should be completed prior to the deck project as <br /> the deck project is along the foundation wall. <br /> Golf Course Irrigation Pond Dredging The irrigation pond has approximately 1 foot of <br /> sediment built up. This project would remove the <br /> sediment and restore the capacity of the pond. <br /> Golf Course Fairway drainage project This is part 2 of a two-part project to improve <br /> fairway drainage. Part 1 has been completed. <br /> Big Island Big Island Planning Prepare a conceptual plan with cost estimates, <br /> including ADA accessible pathways and <br /> destinations throughout the park; dock area <br /> improvements; overlook/pavilion area; beach <br /> improvements; and restroom facilities. The Plan <br /> will include a site map, programming level <br /> estimates, and a report. <br /> Navarre Park Basketball court surfacing Removing the small half-court basketball court and <br /> replacing it with a multi-sport court. <br /> Edwards stated the majority of the 2018 projects relate to the golf course. Edwards noted the grant the <br /> City applied for the Navarre Park was not approved. <br /> Bryce Johnson noted Saga Hills is technically Saga Hill. Johnson suggested under Saga Hill they add <br /> erection of signs saying motorized traffic is prohibited. <br /> Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.