My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-07-2018 Park Commission Packet
Orono
>
Park Commission
>
Agendas
>
Historical
>
Packets
>
2010-2019
>
2018
>
05-07-2018 Park Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 9:02:33 AM
Creation date
1/9/2019 9:02:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PARK COMMISSION <br />Tuesday, January 2, 2018 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 5 of 10 <br /> <br />Ongoing Projects <br />Park Project Scope of Work <br />Saga Hills Saga Hills Restoration Project Place benches (aka sitting stones), complete tree <br />trimming, remove debris piles, erect signs <br />Lurton Park Lurton Park Establish permanent Porta-Potty location, <br />vegetation restoration <br />All Parks and Open Space <br />Comprehensive Plan update <br />Rewrite the parks and open space chapter <br /> <br /> <br />2018 Projects <br />Park Project Scope of Work <br />Bederwood Improvement/Planning Support Park Commission’s preparation of a <br />conceptual plan with cost estimates for <br />improvements to the park and execute if approved <br />and time permits <br />Golf Course Porch/Patio Includes porch for clubhouse <br />Golf Course Cart Parking Run concurrent with porch project as the porch <br />project eliminates current cart parking. Includes <br />retaining wall and pavement for cart parking. <br />Golf Course Fest Tent Area Leveling and clearing a 40’ x 60’ area for <br />placement of a fest tent to facilitate more events at <br />the golf course <br />Golf Course Clubhouse foundation sealing Evaluate the foundation and seal. This project <br />should be completed prior to the deck project as <br />the deck project is along the foundation wall. <br />Golf Course Irrigation Pond Dredging The irrigation pond has approximately 1 foot of <br />sediment built up. This project would remove the <br />sediment and restore the capacity of the pond. <br />Golf Course Fairway drainage project This is part 2 of a two-part project to improve <br />fairway drainage. Part 1 has been completed. <br />Big Island Big Island Planning Prepare a conceptual plan with cost estimates, <br />including ADA accessible pathways and <br />destinations throughout the park; dock area <br />improvements; overlook/pavilion area; beach <br />improvements; and restroom facilities. The Plan <br />will include a site map, programming level <br />estimates, and a report. <br />Navarre Park Basketball court surfacing Removing the small half-court basketball court and <br />replacing it with a multi-sport court. <br /> <br />Edwards stated the majority of the 2018 projects relate to the golf course. Edwards noted the grant the <br />City applied for the Navarre Park was not approved. <br /> <br />Bryce Johnson noted Saga Hills is technically Saga Hill. Johnson suggested under Saga Hill they add <br />erection of signs saying motorized traffic is prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).