Laserfiche WebLink
East Long Lake Trail Comments <br />Committee Comments (September 19th, 2018) <br /> <br /> <br /> <br />Date Sheet What Who Remarks/ Response <br />19 Sep 18 <br /> <br />Preliminary <br />Design concept, <br />5SEP18 <br />Consider construction of a Playground in Summit Beach Jan Berg Could be included or done under a separate project as Playground grants are available. <br />19 Sep 18 <br /> <br />Preliminary <br />Design concept, <br />5SEP18 <br />Consider Wood Duck Boxes UNK Good Follow on Project for a Scout or other volunteer group. <br />19 Sep 18 <br /> <br />Preliminary <br />Design concept, <br />5SEP18 <br />Bird/ Nature watching platform. UNK Consider during detailed design. <br />19 Sep 18 <br /> <br />Preliminary <br />Design concept, <br />5SEP18 <br /> <br /> <br /> <br />Jim Williams <br />345 Ferndale <br />Rd N <br />952-564-0042 <br />