Laserfiche WebLink
t <br /> :i � � �:;;- . .e �f �yF�� <br /> F�N . . w .�; .. ,r � ..�.'`.. �' f <br /> ;"_ i: ��> f.;,�., � `e: 's ^��4 �� <br /> �\ ti) <br /> 1 will be installing the following: <br /> Tanks <br /> ❑■ Precast Concrete ❑ Fiberglass ❑ Plastic ❑ Other <br /> (list manufacturer) <br /> Number of Tanks: 3 <br /> size of Tanks: 1500 1500 1500 <br /> Treatment System <br /> Trenches s.f. <br /> X Mound 44x88 s.f. <br /> Gravel less s.f. <br /> Chamber s.f. <br /> NOTE: The contractor is required to provide an As-Built of the system before the <br /> final inspection. <br /> The undersigned hereby applies to the City of Orono for issuance of a septic system <br /> installation permit, agrees to do all the work in strict accordance with ordinances of the City <br /> and regulations of the State of Minnesota and certifies that all statements made on this <br /> application are compl �; -�e and corre . <br /> Signature of Applicant Date: �6�T/,/U <br /> MPCA License No.: ���5� <br /> Staff Review: Accept ❑ Denied <br /> .� f� � <br /> Reviewer: /t� _i�. Date: � �O <br /> Reason for Denial: <br /> Comments (to be printed on inspection card): <br /> . � .. <br /> W:\(Permits)\Septic Permit Application-Updated Surcharge 7-1-10.doc <br /> 2 �2 <br />