My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-04-2018 Park Commission Packet
Orono
>
Park Commission
>
Agendas
>
Historical
>
Packets
>
2010-2019
>
2018
>
09-04-2018 Park Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2019 11:12:24 AM
Creation date
1/8/2019 11:12:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PARK COMMISSION MEETING <br />Monday, July 2, 2018 <br />6:30 o'clock p.m. <br />ROLL CALL <br />The Orono Park Commission met on the above-mentioned date with the following members present: <br />Chair Rick Meyers, Commissioners Jan Berg, Rick Carter, Bryce Johnson, Brian Roath, Julie Ruegemer <br />and Natalie Williams. Representing Staff were Public Works Director/City Engineer Adam Edwards, and <br />Recorder Jackie Young. City Council Member Victoria Seals was present. <br />Chair Meyers called the meeting to order at 6:34 p.m., followed by the Pledge of Allegiance. <br />The Park Commission agenda was amended to add Item 5, Girl Scout Silver Award. <br />APPROVAL OF MINUTES <br />1. MAY 7, 2018, PARK COMMISSION MEETING MINUTES <br />Berg moved, Roath seconded, to approve the minutes of the May 7, 2018, Park Commission <br />meeting as submitted. VOTE: Ayes 7, Nays 0. <br />PUBLIC COMMENT <br />None <br />PRESENTATIONS <br />2. BOY SCOUT PROJECT — SAGA HILLS FOOT BRIDGE — GAVIN MUELLER <br />Gavin Mueller, Boy Scout, addressed the Park Commission regarding his Eagle Project at Saga Hills. <br />The project will consist of constructing a 40 -foot walkway over a stretch of trail that becomes flooded <br />periodically near the entrance. The walkway will be built between July 16 and 24 by other Boy Scouts <br />and family members. <br />The walkway will be built in four sections of ten feet, four feet wide, with three runners for support. 2 x <br />8's will be used for the decking and 2 x 4's used for the runners and end pieces of each section. Ring <br />shank screws will be used for securing the boards and all lumber will be pressure treated cedar tone wood. <br />The total estimated cost is $663.99, which includes a 10 percent contingency. The minimum anticipated <br />cost is $603.63. <br />Meyers asked whether the money will be coming out of the Park Commission Fund. <br />Edwards indicated that is correct and that the City will be purchasing the materials. <br />Meyers asked whether it will be built on site. <br />Mueller stated the sections will be constructed at his house and then transported to the park. <br />Roath asked where within the park the bridge will be. <br />Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.