Laserfiche WebLink
SECTION 1 <br />INTRODUCTION <br />1.1 IMPETUS: <br />The impetus for this report is a request from the City of Orono to evaluate the <br />feasibility of adding a pedestrian only trail along North Arm Drive, <br />1.2 REPORT ORGANIZATION: <br />To address the replacement options in an orderly manner, the report is <br />organized in three (3) sections as follows: <br />Section 1: Introduction <br />Section 2: Trail Construction <br />Section 3: Financing 1 Funding <br />Figures: Project Map, Trail Section, and Site Photos <br />1.3 OVERALL FEASIBILITY AND COST EFFECTIVENESS <br />All improvements addressed within this report are feasible from a technical <br />standpoint. The improvements are necessary to provide safe and adequate <br />infrastructure, and represent cost effective solutions for doing so. Figure No 1 <br />shows the locations of the proposed project components. <br />R-2 <br />