Laserfiche WebLink
'=o~ <br /> / � � ``�.�\ <br /> !��� ��`� ONa <br /> �� ��. i CITY o� �it <br /> � ,�I, <br /> � 1��� �i.�,a.. <br /> � r�i � MunicipalOffices <br /> l � � r i , � ' <br /> �� � , �' `+ Mailing Address: <br /> ��` '� ;,' ` � `� G '' Street Address: <br /> '; � ' ; '` '� P.O. Box 66 <br /> �. ,<q�Esx�¢, 2750 Kelley Parkway <br /> '���:__ — Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address ���� �� 1 J P� J +�P�s <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No �L <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes � <br /> No � <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31,2010 , <br /> Other <br /> Septic Tank�Pump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out ry three years. City records indicate the tank(s) were last pumped out on <br /> �°- 1 �' q � . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> r. <br /> r <br /> °a: . � <br /> �p �� <br /> Inspector: <br /> Date of Inspection ���� <br /> Telephone(952) 249-4600 � Fax(952)249-4616 <br /> www�i r►rnnn.mn.us <br />