Laserfiche WebLink
CMP Part 4B. Sanitary Sewer Plan <br /> Table 4B-7:Sanitary Sewer Projections by Interceptor <br /> Based on Residential Equivalent Unit(REC) - - _ _ <br /> Orono Sewer 2010 2020 2020 2030 2030 2040 2040 <br /> Service Area change Change Change <br /> M431 458 41 499 140 639 38 677 <br /> M435 593 41 634 0 634 66 700 <br /> Wayzata 6 0 6 0 6 0 6 <br /> Long Lake 372 49 421 140 561 76 637 <br /> Plymouth 2 0 2 0 2 0 2 <br /> Total 2591 99 2690 203 2893 383 3276 <br /> Based on Flow(Million Gallons Per Day) <br /> 2020 2030 2040 <br /> 2010 Change 2020 Change 2030 Change 2040 <br /> M431 0.11 0.01 0.12 0.04 0.16 0.01 0.17 <br /> M435 0.15 0.01 0.16 0 0.16 0.02 0.18 <br /> Wayzata 0 0 0 0 0 0 0 <br /> Long Lake 0.09 0.01 0.11 0.04 0.14 0.02 0.16 <br /> Plymouth 0 0 0 0 0 0 0 <br /> Total 0.65 0.02 0.67 0.05 0.72 0.1 0.82 <br /> City of Orono Community Management Plan 2020-2040 Part 4B, Page 10 <br />