My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
11-19-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 3:54:45 PM
Creation date
1/4/2019 3:53:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4B. Sanitary Sewer Plan <br /> 1. Southwest Orono System(MCES metershed M435): This system consists of two sub systems; <br /> the Lift Station 59 system and the downstream interceptors system. The Lift Station 59 system <br /> consists of all lines which are upstream from and ultimately discharge to MCES Lift Station #59 <br /> (LS-59).The system was constructed with eighteen projects from 1964 to 2007. This is the original <br /> municipal sewer system and it still serves the majority of urban Orono. These lines were installed <br /> to provide pollution abatement and sewer service to the Navarre business area and to the urban <br /> residential areas along Lake Minnetonka. The downstream interceptors system consists of all <br /> trunk and lateral lines which directly discharge to the Orono-Long Lake Interceptor(MCES 7113 <br /> and 7113A) downstream from L.S. 59 but upstream of Meter# 435. These direct discharges are <br /> via City-owned and maintained lift stations pumping into the MCES force main at a limited <br /> number of locations. Construction occurred during 1980-2014. <br /> 2. Highway 12 Area System (MCES metershed M431): This system consists of all lines which are <br /> upstream from and ultimately discharge to LS-60. Construction consisted of sixteen Projects from <br /> 1967 to 2018. This portion of the municipal system was initially constructed as an extension of <br /> the Long Lake municipal system primarily to provide sewer(and water)service to the Orono High <br /> School. This system currently serves all of the urban and commercial area in the North West <br /> portion of the city along the County Road 6 and 112 corridor. <br /> 3. Long Lake Connections. This system consist of all of the lines that connect directly into the <br /> Long Lake Municipal Sewer System. The system was constructed in a series of projects from <br /> 1970 to 2018. <br /> 4. Wayzata System Extensions: Sewer laterals which connect to extensions of the Wayzata sewer <br /> system along Orono's eastern boundary. Construction consisted of six Projects 1970-2009. This <br /> portion of the Orono municipal sewer system functions as an extension of the Wayzata system <br /> serving existing housing adjacent to the Wayzata border. <br /> 5. Plymouth Direct Connection. The City has one property directly connected to the Plymouth <br /> municipal system, St. Edwards Church on North Ferndale Road. No further connections to the <br /> Plymouth system are anticipated. <br /> 6. Lift Stations. The Orono Sanitary Sewer system is serviced by 44 Lift Stations, listed on Table <br /> 4B-1: Lift Stations. <br /> 7. Agreements with Adjacent Cities. In order to provide municipal sanitary service in the most <br /> cost effective manner the City of Orono partners with neighboring cities. Orono residents are <br /> served by connection to Plymouth, Long Lake and Wayzata. Orono provides service to residents <br /> from Wayzata, Spring Park and Medina. Table 4B-2 below lists the current agreements with other <br /> municipalities. <br /> 6: <br /> City of Orono Community Management Plan 2020-2040 Part 4B, Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.