My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
11-19-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 3:54:45 PM
Creation date
1/4/2019 3:53:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4A. Transportation Plan <br /> site parking facilities. <br /> 6. The City will pursue additional pedestrian and bike-hike trail facilities. <br /> 7. The City will promote improved mass transportation services for urban neighborhoods, <br /> including park and rides. Orono encourages improved bus scheduling and improved <br /> service, especially at off-peak hours. <br /> Rural Transportation Policies <br /> 1. Public streets in the rural area will be primarily limited to the existing collector and arterial <br /> grid system. <br /> 2. The Ring Route concept utilizes as much as possible the existing rural highway system. <br /> 3. The City of Orono will encourage all necessary road system improvements required to <br /> accommodate and to facilitate through traffic on the Ring Route. <br /> 4. Rural residential developments will utilize private road feeders to supplement the existing <br /> public road grid. <br /> 5. Private rural roadways will be constructed to rural design standards. <br /> 6. The City will guarantee reasonable maintenance levels and public access on all private roads. <br /> 7. Driveway locations and rural street or private road intersections will be limited for traffic <br /> safety. <br /> 8. Rural trails are an integral part of the total alternate transportation system. <br /> 9. Mass transportation services for rural Orono are not economical, hence the City will <br /> promote the use of Park and Ride locations where local service is not feasible. <br /> City of Orono Community Management Plan 2020-2040 Part 4A, Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.