Laserfiche WebLink
CMP Part 4A. Transportation Plan <br /> TABLE OF CONTENTS CMP PART 4A <br /> TRANSPORTATION PLAN <br /> Page <br /> Introduction 2 <br /> Purpose and Scope 2 <br /> Roadways 3 <br /> Fig 1 Functional Classification 4 <br /> Table 4A-1 Roadways Classification Summary 5 <br /> Table 4A-2 A Minor Arterials 6 <br /> Table 4A-3Collectors 7 <br /> Table 4A-4 MSA Roads 8 <br /> Table 4A-5 Road Design Capacity 9 <br /> Table 4A-6 Road Capacity 10 <br /> Table 4A-Future Capacity 12 <br /> Fig.2 Ring Road Concept 11 <br /> Fig 3 Access Curve 12 <br /> Fig. 4 Maintenance/Cost Curve 14 <br /> Table 4A-8 Maintenance 15 <br /> Trails 16 <br /> Lake Access 18 <br /> Table 4A-9 18 <br /> Transit 22 <br /> Freight 22 <br /> Aviation 22 <br /> Implementation Plan. 23 <br /> Table 4A-10 Goals and Objectives 23 <br /> Table 4A-11 Transportation History 27 <br /> Appendix <br /> A. TAZ Zones <br /> B. Map T-1 Existing Functional Class <br /> C. Map T-2 Existing Jurisdiction <br /> D. Map T-3 TAZ zones <br /> E. Map T-4 Existing Traffic Volume <br /> F. Map T-5 ADT <br /> G. Map T-6 Existing non-motorized facilities <br /> H. Map T-7 Existing and Planned Transit Infrastructure <br /> I. Map T-8 Metropolitan Freight Systems <br /> City of Orono Community Management Plan 2020-2040 Part 4A, Page 1 <br />