Laserfiche WebLink
CMP Part 3A. Environmental Protection Plan <br /> Table 3A 1 LakkMinnetonka'Physical Statistics b 4: ' <br /> Lake Minnetonka Portion within City of%in Orono <br /> Orono <br /> Water Surface Area 14,300 acres 4,750 acres 33% <br /> Shoreline Length 131 miles' 40.4 miles2 31% <br /> Watershed Area 71 sq.mi.dry land 22 sq.mi.wetlands 13.4 sq.mi. 19% <br /> 7 sq. mi. other water bodies 23 sq. mi. basin 2.7 sq.mi. 12% <br /> of Lk.Mtka 123 sq.mi. 0.6 sq.mi. 9% <br /> 7.4 sq.mi. 32% <br /> 24.1 sq.mi. 20% <br /> 'MCWD Water Resources Management Plan 2City calculation <br /> ORONO'S LAKES. CREEKS AND WETLANDS <br /> Other significant lakes in Orono include Long Lake, Mooney Lake, Lydiard Lake, Lake Classen <br /> and Dickey's Lake. Lydiard Lake and Dickey's Lake drain into Long Lake which flows into Long Lake <br /> Creek and eventually Tanager Lake (bay) of Lake Minnetonka. Lake Classen drains into Stubbs Bay of <br /> Lake Minnetonka and Mooney Lake drains through Plymouth and Wayzata before discharging into <br /> Wayzata Bay of Lake Minnetonka. Table 3A-2 below provides some general information on all of <br /> Orono's lakes. <br /> Table 3A-2: Lake Sizes and Shoreland Class` ications', <br /> Basin Area DNR <br /> Total Basin in City of <br /> Lake Classification Area Orono OHWL Protected Waters <br /> (Acres) (Acres) Inventory Number <br /> Natural Environment(NE) <br /> Lake Classen Dickey Lake 117 117 974.5' 162-P <br /> French Lake(South Basin Only) 26 26 985.5' 161-W <br /> (Includes 78 ac.wetlands) <br /> Lydiard Lake 89 89 930.0' 140-P <br /> (Includes 20 ac.wetlands) <br /> Lake Katrina 33 33 970.9' 159-P <br /> (Includes 26 ac.wetlands in Orono) - - <br /> Recreational Development(RD) <br /> Long Lake 320 210 944.3' 160-P <br /> Mooney Lake 118 10 988.0' 134-P <br /> Tanager Lake(Part of Lk Mtka) -74 -74 929.4' 141-P <br /> General Development(GD) <br /> Forest Lake(Part of Lk Mtka) -127 -127 929.4' 139-P <br /> Lake Minnetonka 14,310 4,750 929.4' 133-P <br /> City of Orono Community Management Plan 2020-2040 Part 3A, Page 4 <br />