Laserfiche WebLink
;`�IIIIIIII� Giertsen Company <br /> ` Wind,fire,water and mold restoration specialists <br /> suice 1918. <br /> CONTINUED-Garage <br /> DESCRIPTION CALC QNTY <br /> 74. Additional cost for high wall or ceiling- 11'to 14'hi�h C 942.08 SF <br /> 75. R&R Attic entrance cover and trim 1 1.00 EA <br /> 76. Clean concrete on the floor F 942.08 SF <br /> 77. R&R O�rerhead door&hardware- 16"x 8"-High grade 1 1.00 EA <br /> 78. R&R Overhead door&hardware-9'x 8'-High grade 1 1.00 EA <br /> NOTES: <br /> Windo�vs <br /> DESCRIPTION CALC QNTY <br /> 79. Content Manipulation chaz�e-per hour 12 12.00 HR <br /> Note:Additional contents manipulation labor to service window units in rooms throughout the house where uo other ser��ices are <br /> being perfo�ned. <br /> 80. (Material Only)Windows-units,supplies and triin 1 1.00 EA <br /> throuhgout home as selected per Twin City Building Supply <br /> quote <br /> Note:Also includes double door unit on rear elevation of hasement as well as the french doors in the kitchen. <br /> 122. Stainin�and finishing of all window units(time and 1 1.00 EA <br /> inaterial item) <br /> 81. Door InstallerlFinish Caipenter-per hour 14 14.00 HR <br /> 82. Stain&fuush French door slab oiily-(per side) 2 2.00 EA <br /> 83. Prime&paint door siab only-exterior(per side) 4 4.00 EA <br /> 84. Window Installer-per hour 196 196.00 HR <br /> Note:This is an approximation of the labor required to install approved window units at the time of the printing of this estimate. <br /> The hours reflected are a crew of 4 installers over a week's time.Should the labor hours iacrease,the contractor agrees to show <br /> time cards to support additional charges,if necessary. <br /> 85. (Install)Casing-oversized-3 1/4"stain grade 490 490.OQ LF <br /> 86. Finish C'arpenter-per hom• 10 lO.OQ HR <br /> DAVISWORKING 1/5/2010 Page: ll <br />