Laserfiche WebLink
, �������� <br /> Hennepin County <br /> AET Project No. OS-06764 <br /> May 24, 2016 <br /> Page 3 of 5 <br /> • Adult Correctional Facilitv <br /> The soil boring encountered fill that extended to a depth of approximately 6 %z feet. The <br /> fill consisted mostly of lean clay with gravel to a depth of 2 '/2 feet then lean clay with <br /> sand to a depth of 5 feet, sandy lean clay with a trace of gravel to a depth of 6 feet and <br /> clayey sand to a depth of approximately 6 'h feet. The boring terminated at a depth of 7 <br /> feet in sand that was fine to medium grained. It was not possible to determine if the sand <br /> was natural soil or fill. <br /> Helical Anchor Analysis <br /> We completed a dynamic cone penetrometer (DCP) test at a depth of 6 feet in each of the <br /> borings. Based on a correlation to DCP blows, we estimated the standard penetration resistance <br /> (N-value) at the DCP locations. Using the estimated N-value, we determined the uplift resistance <br /> of the soil with installation of a 4-inch diameter helical anchor. Our analysis indicates that <br /> adequate capacity is available to resist pullout from a 990-pound force from the guy wires. Our <br /> analysis includes a minimum factor of safety of two. <br /> The test location at the Adult Correctional Facility encountered uncontrolled fill. Uncontrolled <br /> fill is fill that appears to have been placed without regard to consistency or compaction effort. <br /> Consequently, inadequate bearing capacity may occur at some of the anchor locations because of <br /> the variability in the condition of the fill. As a result, deeper embedment of the anchors may be <br /> required at this site. The capacity of the anchor will need to be verified at the time of placement <br /> by measuring the torque required to install it. <br /> Deadman Anchor Anal.� <br /> We understand that concrete deadman anchors may be utilized at some of the towers. The size <br /> and installation of the deadmen is specified in the Campbell Instruction Manual. For a deadman <br /> anchor buried with compacted backfill and its top at grade (i.e. no soil overburden on the <br /> anchor), we recommend assuming the resistance to uplift is equal to the weight of the concrete in <br /> the anchor. Backfill around the deadman anchor should be compacted to a minimum of 95 <br /> percent of its maximum dry density based on the standard Proctor test (ASTM International, <br /> Specification D698). <br /> For wind uplift, which is a transient load, we recommend using a minimum factor of safety of <br /> 1.5 for the ratio between the calculated uplift resistance and the design uplift loads. For a 2'x 2' <br /> x 2' deadman (as specified in the Campbell Instruction Manual), the weight would be <br /> approximately 1,200 pounds which is 1.2 times the design uplift load. To achieve a 1.5 factor of <br /> safety, a minimum 27" x 27" x 27" deadman should be used. <br /> Frost Heave <br /> The soils present on the five sites have a moderate to high frost heave potential. If lenses of silt <br /> are present within the soil profile, about 1 to 3 inches of frost heave may occur. Frost penetration <br /> in clay soils would be approximately 4 feet during an average winter, and 5 feet during a severe <br /> winter. Comparable frost penetration for sand soils would be about 6 feet during an average <br /> winter, and 7 feet during a severe winter. These frost penetration depths assume there is no snow <br /> cover providing insulation to the underlying ground. <br />