My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/2013 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2013
>
11/18/2013 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 3:44:37 PM
Creation date
12/20/2018 3:44:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,November 18,2013 <br /> 6:30 o'clock p.m. <br /> Mike Sharratt,Designer, stated they started on this project in 2011 and have been working through the <br /> changes in the zoning ordinance. Sharratt stated it is their opinion that the proposed grades they are now <br /> proposing to fill in were originally there at one point in time. The wood retaining walls were the result of <br /> the dirt that was removed and that they are proposing to remove those retaining walls and refill in that <br /> area. <br /> Sharratt stated the other item is that the two side yard nonconformities will be made conforming as part of <br /> this project. The existing deck, which is currently almost entirely over the average lakeshore setback,will <br /> be made conforming. Sharratt noted the property owners have the right to rebuild the deck but that they <br /> have elected to fill in the grade beyond the deck on the northeast corner and then remove the deck <br /> structure and railing. <br /> Sharratt noted the one corner of the house is also nonconforming and will be cured as part of this project. <br /> The current proposed hardcover is 21.1 percent and structural coverage will be 13.5 percent. Sharratt <br /> stated once the project is complete,the property owners will end up with a fully landscaped yard where <br /> the slope occurs and that their plans are being revised to meet the 3:1 slope. Sharratt indicated they will <br /> be forwarding those revised plans to Staff in the next couple of days. Sharratt stated the plan will be fully <br /> compliant in every way and that they are simply attempting to recreate what was originally there. <br /> Schwingler commented the application is pretty straight forward and will be an improvement. <br /> Landgraver stated when you are on the property, you can see that the property to the south has a drainage <br /> issue. Landgraver asked what the applicants' plans are relating to the drainage. <br /> Sharratt illustrated the drainage swales and the flow of the drainage on the overhead. Sharratt indicated <br /> drainage swales will be created to divert the runoff down the property onto the flatter portion of the slope. <br /> Sharratt noted there is also a catch basin that was installed by the City. Sharratt stated at some point in <br /> time there was a significant amount of erosion that was occurring which resulted in the retaining walls. <br /> Landgraver asked if it is the applicants' expectation that they will be able to implement the swales on the <br /> upper part of the property without any significant damage to the trees in the area. <br /> Sharratt stated the one existing tree is located 15 feet away from the property line and it will not be <br /> impacted by the work. <br /> Landgraver noted one of the neighbors had expressed a concern about the tree and the drainage. <br /> Leskinen asked if a portion of the stone patio will be at the level of the top of the timbers. <br /> Sharratt illustrated the location of the patio. Sharratt stated it would be at essentially at the elevation of <br /> the first floor of the existing house. <br /> Thiesse asked whether all of the timber walls would be removed. <br /> Sharratt stated they will be. Sharratt pointed out a portion of the retaining wall that is located on the <br /> neighbor's property. Sharratt stated that also will be corrected as part of this project. <br /> Chair Leskinen opened the public hearing at 8:45 p.m. <br /> Page 22 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.