My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, DIVISION 02 Section 02300 - Earthwork <br /> � B. Subbase and Base Courses:Under pavements and walks,place subbase course on prepazed <br /> subgrade.Place base course material over subbase.Compact to required grades,lines,cross <br /> sections,and thickness to not less than 95 percent of maximum dry unit weight according to <br /> � ASTM 01557. <br /> C. Under slabs-on-grade,place drainage course on prepared subgrade.Compact to required cross <br /> ' sections and tluckness to not Iess than 95 percent of maximum dry unit weight according to <br /> ASTM D 698. <br /> � 3.07 TESTING AGENCY <br /> A. Owner will engage a qualified independent geotechnical engineering teshng agency to perform <br /> field quality-control testing. <br /> � 1. Allow testing. agency to inspect and test subgrades and each fill or backfill layer. <br /> Proceed with subsequent earthwork only after test results for previously completed work <br /> , comply with requirements. <br /> 2. When testing agency reports that subgrades,fills, or backfills have not achieved degree of <br /> compaction specified, scarify and moisten or aerate,or remove and replace soil to depth <br /> � required;recompact and retest until specified compaction is obtained. <br /> 3.08 PROTECTION <br /> � A. Repair and reestablish grades to specified tolerances where completed or partially completed <br /> surfaces become eroded,rutted,settled,or where they lose compaction. <br /> ' B. Where settling occurs before Project conection period elapses,remove finished surfacing, <br /> back-fill with additional soil material,compact,and reconstruct surfacing. <br /> ' 3.09 DISPOSAL <br /> A. Remove surplus satisfactory soil and waste material,including unsatisfactory soil,trash, and <br /> � debris,and legally dispose of it off Owners property. <br /> B. Contractor to provide unit price for removal and disposal of surplus excavated earth at <br /> appropriate place on the bidding form. Provide unit price per cubic yazd. <br /> � END OF SECTION 02300 <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � Page 02300- 5 <br /> HENNEPIN COUNTY Orono Salt Storase <br /> March 22.2002 Proiect No.:0031569 Contract No.:0751 R2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.