Laserfiche WebLink
' DIVISION 02 Section 02300 - Earthwork <br /> � E. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel,crushed <br /> stone,and natural or crushed sand;ASTM D 2940;with at least 90 percent passing a 11/2 inch <br /> (38 mm)sieve and not more than 12 percent passing a No.200(0.075 mm)sieve. <br /> � F. Bedding: Naturally or artificially graded mixture of natural or crushed gravel,crushed stone, <br /> and natural or crushed sand;ASTM D 2940;except with 1(�percent passing a 1 inch(25 mm) <br /> � sieve and not more than 8 percent passing a No.200(0.075 mm)sieve. <br /> G. Drainage Fill:Washed,narrowly graded mixture of crushed stone,or crushed or uncrushed <br /> gravel;ASTM D 448;coarse-aggregate grading Size 57;with 100 percent passing a 1-1/2-inch <br /> � (38 mm)sieve and not more than 8 percent passing a No.200(0.075 mm)sieve. <br /> 1 PART 3. EXECUTION <br /> 3.01 PREPARATION <br /> ! A. Protect structures,utilities,sidewalks,pavements,and other facilities from damage caused by <br /> settlement,lateral movement,undernuning,washout,and other hazazds created by earthwork <br /> operations. <br /> � B. Contractor is ex cted to contact Go her State One Call to ascertain location and position of <br /> underground u ilities before beginning of any excavation,grading and/or trench digging on <br /> � this site. <br /> C Provide erosion-and sedimentation-control measures. <br /> , D. Prevent surface water and ground water from entering excavations,firom ponding on prepared <br /> subgrades,and from flooding Project site and surrounding areas. <br /> I E. Protect subgrades from softening,undermining,washout,and damage by rain or <br /> water accumulation. <br /> � 3.02 EXCAVATION <br /> A. Excavate to subgrade elevations regardless of the character of surface and subsurface <br /> conditions encountered,including rock,soil materials,and obstructions. <br /> � 1. If excavated materials intended for fill and backfill include unsatisfactory soil <br /> materials and rocly replace with satisfactory soil materials. <br /> � B. Excavate for structures,pavements,and walks to indicated elevations and dimensions. <br /> Extend excavations for placing and removing concrete formwork,for installing services <br /> and other construction,and for inspections.Trim bottoms to required lines and grades to <br /> � leave solid base to receive other work. <br /> C. Excavate utility trenches to indicated gradients,lines,depths,and invert elevations of uniform <br /> widths to provide a working clearance on each side of pipe or conduit. Excavate trench walls <br /> � vertically from trench bottom of 12 incltes(300 mm)higher than top of pipe or condui� <br /> D. Proof roll subgrades before filling or placing aggregate courses,with heavy.pneumatic- <br /> � tired equipment to identify soft pockets and areas of excess yielding.Do not proof roll wet or <br /> saturated subgrades. <br /> E. Reconstruct subgrades damaged by freezing temperatures,frost,rain,accumulated water,or <br /> � construction activities. <br /> � Page 02300- 3 <br /> HENNEPIN COUNTY Orono Salt Storase <br /> March 22.2002 Proiect No.:0031569 Coirtract No.:0'751R2 <br />