' <br /> Hennepin County Special Requirements,Property Services SUPPLEMENTARYINSTRUCTIONSTOBIDDERS <br /> ' SPECIAL REQUIREMENTS: BIDDING/CONSTRUCTION DOCUMENTS FOR CONSTRUCTION PROJECTS <br /> BID FORM <br /> , Page 4 of S <br /> 9.1.2 In examiningthe site,the Bidder shall become fully informed and record all investigations as <br /> to the condition of the site and surrounding area,locations and accessibility, existing utilities <br /> 1 and features,relocations that might be necessary to accomplish the work under the Contract, <br /> available facilities and difficulties that may be encountered therewith, other work that may <br /> be m progress thereon at the time the bid is submitted and other relevant matters which may <br /> , affect the Bid or accomplishment of the work under the Contract Documents. <br /> 9.2 PROMPT PAYMENTTO SUBCONTRACTORS. <br /> � 9.21 Bidders are advised that Minnesota Statutes Section 471.425, subd. 4a, requires prompt <br /> �yment to Subcontractors. The law requires the prime Contractor to pay any <br /> , Subcontractor within ten days of the prime Contractor's receipt of payment from the <br /> County for undisputed services provided by the Subcontractor. The law also requires the <br /> prime Contractor to pay interest of 1-1/2 percent per month on any undisputed amount not <br /> ' paid on time to the Subcontractor. <br /> AR1'�CI.E 10 <br /> ICONTRACT TIME <br /> ' 10.1 The Bidder shall achieve Substantial Completion of the Work as specified in Section 00800, <br /> Supplementary Conditions, Para.graph 8.4 Liquidated Damages. If the Contractor fails to <br /> complete its obligations within the project schedule, the Owner will be entitled to damages <br /> , on a daily basis. <br /> ARTICLE 11 <br /> I �,��A� <br /> ' 11.1 T'he Owner reserves the right to reinstate any alternate bid rejected at the time of contract <br /> award in the amount proposed by the successful Bidder, provided such reinstatement is <br /> made within one hundred twenty (120) days after the Bid opening. However, the Owner <br /> , sl�ll not reinstate an alternate bid unless the successful Bidder, with the inclusion in the <br /> contract award of any such alternate bid,would have been the successful Bidder at the time <br /> of contract award. <br /> rARTICLE 12 <br /> , P�tE-BID CONFERENCE <br /> 12.1 T'he Architect shall conduct a Pre-Bid Conference at the site, as per the Advertisement for <br /> Bids, for the benefit of the Bidders. All Bidders are encouragedto attend. A Small Business <br /> ' Enterprise mixer,to encourage new working relationships between the Bidders and SBE sub- <br /> contractors, may occur at this time,at the County's option. <br /> , Suppl Instr Bidders-4 <br /> HENNEPINCOUNTY Orono Salt Storage <br /> March 22,2002 Project No.: 003 t 569 Contract No.: 0751 R2 <br /> , <br />