Laserfiche WebLink
� <br /> DIVISION Ol CONSTRUCTIONFACILITIES&TEMPORARY CONTROLS-Section 01500 <br /> , <br /> SECTION 01500 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS ' <br /> PART 1 GENERAL , <br /> 1.01 CONDTI'IONS OF THE CONTRACT <br /> A.The Conditions of the Contract(General, Supplementary, and Other Conditions}and the General , <br /> Requirnments(Sections of Division 1), apply to the workof this section <br /> 101 REQUIREMENTS INCLUDED , <br /> A. Electricity, Lighting. <br /> B. Heat, Ventilation. , <br /> C. Telephone Service. � <br /> D. Water. <br /> E. Sanitary Facilities. � <br /> F. Barriers. <br /> G. Enclosures. � <br /> H. Protection of Installed Work. <br /> I. Security. � <br /> J. Cleaning During Construction. � <br /> K Temporary Signs <br /> L. Field Office and Sheds � <br /> M. Removal <br /> 1.02 RELATED REQUIREMENTS � <br /> A. Section 01010-Summary of Work: Contractor use of premises. � <br /> B. S ection 01700-Contract Closeout:Final cleaning. <br /> 1.03 QUALITY ASSURANCE <br /> A. Regulations: Comply with industry standards and applicable laws and regulations of authorities ' <br /> having jurisdiction <br /> B. Standazds: Comply with NFPA Code 241, Building Construction and Demolition Operations, ANSI- � <br /> A10 Series standazds for Safety Requirements for Construction and Demolition, and NECA Electrical <br /> Design Library,Temporary Electrical Facilities. <br /> 01500-1 ' <br /> HENNEPINCOUNTY �ono Salt Stora¢e <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> � <br />