Laserfiche WebLink
TECHNICAL MEMORANDUM <br /> HDR ENGINEERING, INC. <br /> Table 2—Action Items <br /> Action �tem �escriptian Recornmended Time ��rr�nt <br /> to Comp�ate ltem <br /> The side bank near the northeast corner of the pond As soon as possible. A <br /> has experienced erosion and requires immediate repair <br /> measures. The vegetative buffer strip should be <br /> reestablished in that part of the pond to prevent further <br /> deterioration of the side bank. <br /> The grates should be installed over the inlet culvert and As soon as possible B <br /> the outlet culvert (downstream end) of the Orono wet <br /> detention pond. <br /> The vegetation around the downstream end of the During normal, C <br /> outlet structure of the pond should be trimmed where it scheduled maintenance <br /> impedes access to the outlet structure requiring periodic and as needed. <br /> inspection. <br /> A periodic inspection of the pond should be scheduled As needed D <br /> to keep the pond in operating and optimum condition. <br /> Comment Item A <br /> The northeast periphery of the Orono pond has undergone erosion and some cracks were observed <br /> in the side bank during the inspection visit. It was also noticed that the northeast side bank consists <br /> of the low cohesive soil with lots of small pebbles and rocks which might be due to construction of <br /> the storage facility (constructed after the pond ) further north of the pond. The top soil of the <br /> northeast side bank should be immediately replaced with the fertile cohesive soil and a seed mix <br /> should be sprinkled to develop a vegetative buffer strip in this part of the pond. The vegetative <br /> buffer strip will not only provide slope stability to the side bank but also improve the water quality <br /> and pollutant removal efficiency of the pond. <br /> Comment Item B <br /> The grate over the inlet structure and outlet structure (d/s end) at the Orono wet detention pond was <br /> not seen during the inspection visit. The provided design plan sheets do not include/show a grate <br /> over the inlet structure and the downstream end of the outlet structure. It is recommended that the <br /> grates should be installed over the inlet and outlet structure to trap the trash and debris and <br /> improve the water quality of the Orono wet detention pond. <br /> Comment Item C <br /> The degree and density of the vegetation around and in the pond is appropriate at this time. If the <br /> vegetation at the location of the inlet and outlet structures becomes excessive and impedes access <br /> for visual inspections, it should be thinned as needed. The growth of large trees should only be <br /> allowed where they will not impede the performance of the inlet and outlet structures and will not <br /> compromise bank stability. <br /> 11/4/2005 <br /> HDR PRO,IECT#32560 6 HENNEPIN COUNTY,MINNESOTA <br /> ORONO TRUCK STATION FACILITY <br /> STORM WATER POND EVALUATION <br />