Laserfiche WebLink
. . . <br /> �nn��� n�C�� <br /> . ' ,, s °�� <br /> �,� '��� <br /> 3. Contractor may erect one 3-0" � � <br /> project sign as specified. X 5'-0" sign on job site office, and one� <br /> 4• See detail 8/AO for the Project Sign design. Erect Project Sign within 1 <br /> week of start of construction. (Coordinate location with city or Ooron). <br /> 5. Erect all silt fences and rock entrances before beginning site work <br /> Maintain all during the construction period. • <br /> 6• Contractor shall keep all adjacent streets & drives, and sidewalks to <br /> remain, swept clean & free of mud, snow, trash, etc, all during the <br /> period of construction. <br /> 7• Snow removal on site & site maintenance are the Contractor's <br /> responsibilities. <br /> $• Contractor shall maintain all erosion control devices installed as a pa� <br /> of this work to the satisfaction of the Authority having jurisdiction.. <br /> 1� 01700 — Project Closeout: (Review of Punch List Procedures & Owner <br /> Orientation) <br /> k. 01720—Project Record Documents ("As-builts"are to be kept up-to-date . <br /> �. 01730 — Operation and Maintenance Manuals. (Need ASAP ) <br /> is done) , - not after job <br /> m. Owner's Orientation & Training shail be completed ASAP. <br /> n. 01740—Warranties and Bonds <br /> o. Permits & Taxes: Contractor shall be responsible to a <br /> permits, and fees as required by his contract. Owner N,�i j foa ali taxes, <br /> Council SAC & WqC charges, (UNO). P y for Met. <br /> p. Time extensions are to be requested by the contractor within 10 days of <br /> discovering a legitimate need. Requests made after this time ma <br /> considered by the owner/ architect for approval. If change order itemstwill <br /> add additional contract time, they must be noted on the change order when <br /> issued. <br /> q. Substitutions will not be allowed now under this contract unless the <br /> specified products are no longer availabie or special circumstances arise to <br /> be considered by the architect and owner. <br /> �• Contractor to secure final plat prior to beginning construction. Review for <br /> any discrepancies with the preliminary plan and notify the architect with any <br /> discrepancies, in writing immediately. <br /> s• The Owner shali secure and pay for the State Surcharge on Sewer Access <br /> Charge (SAC , <br /> ) Water Access Charge (WAC), as well as any connection <br /> charges typical to this work as required by City, State, Metropolitan Council, <br /> or otherjurisdictions having authority. <br /> Navarre Fire Station Pre-construction Nieeting <br /> 1124.10 <br />� �or�8 <br />� Q:\1124-10\bus\1124-l OPRECON.mtg.D OC <br />