Laserfiche WebLink
JUL-19-2000 11:04A� FROM-LES JONES ROOFING 612-881-7009 T-838 P.007/007 F-002 <br /> �� • ' _ <br /> �, .. . <br /> _ � Gaod Shcphej�I.:��::�n Church <br /> " �� �•�a� 3. :Ui�G <br /> Roof Membrane <br /> 1. Install Firestone RPM sarip to secure tha field mambrane at the perimeter. <br /> 2. lastall onc layer of 45 mil Firestone EPDM(Fully Adhered)roof inembtane over the top of <br /> the new insulation. <br /> 3. �ully adhere EPDM(Rubber)membrane up and over the canted roof�dge and fas�n az the <br /> perimeter at a rate of twe)ve inches on cemer. <br /> Meta)Tnstallatinq <br /> New custom fabricated 24 gauge pre-finished metal cdge, including cover plates,will be made <br /> and installed a�t the perimeter. New 24 Gauge,pre-finished sh�et matal scuppers will be <br /> fabricaied, installed, and flashed with F1�DM. <br /> 1Vlaterial and labor for this opYion is: $12,DOp,QO <br /> Initial <br /> All other terras and speci�cations remain the same as t6e proposal dated 4/28/00 <br /> L�S rUNES YtOO�TNG,�C. <br /> � <br /> By <br /> D�nnis Dunnigan <br /> Sales&Estimaring <br /> Y have read and understand this addendum,and agr�e to all of the ten�ns and coaditions contained <br /> herein. <br /> Accepied: �-�- <br /> Date: z��� <br /> -2- <br />