My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
09-25-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:50 AM
Creation date
12/13/2018 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� �w <br /> Table 9.3- 10-Year Phosphorus Reduciion Plan <br /> Long Lake Creek <br /> Phosphorus Lake Painters <br /> Reduction(Ib/yr) MinneMnka Creek <br /> ID Activity Description Long R ducti ns R duction T�� <br /> Upstream �ke to <br /> of Long Tanager ��b/yr) (Ib/yr) <br /> Lake �ke <br /> �P{1 "Offerman Ditch"Ravine 26 3 26.3 <br /> Stabilization <br /> Fox Street near western <br /> CIP{2 terminus dry pond/ 0.7 0.7 <br /> infiltration <br /> QP-C3 North Shore Drive and 0.7 0.7 <br /> Shad ood Road rain arden <br /> QP-C4 Bradcetts Pt. Road ond 0.7 0.7 <br /> Casco Point rain gardens, <br /> CIP-05 sump manholes, restored 1.5 1.5 <br /> swale <br /> �P_i Stubbs Bay ravine 32 32 <br /> stabilization <br /> QP_2 Stubbs Bay Wetland 15 15 <br /> Restoration <br /> CIP-3 Willow Drive Roadside BMPs Z•� 2•� <br /> Fox Street/Old Crystal Bay <br /> QP-4 Road Ponding and 1.7 1.7 <br /> Conve ance Im rovemerrts <br /> QP_5 Orono Orchard Road 4.� 4 <br /> Road�de BMPs <br /> CIP-6 Long Lake Wetland 16 16 <br /> Restoration <br /> �P_� Long Lake Ravine 12 12 <br /> Stabilization <br /> West Lafayette Road <br /> QP-8 Roadside BMPs and Water 1.6 1.6 <br /> uali Im rovements <br /> �P_9 Forest Lake Landing Water 0.38 0.38 <br /> uali Im rovements <br /> QP-10 Old Crystal Bay Road 2 5 2.5 5 <br /> Roadside BMPs <br /> QP-11 Corrtributions to South 55 55 <br /> Katrina Marsh Im rovements <br /> CIP-12 Long Lake Creek Corridor Zp 20 <br /> Im rovements <br /> OC-1 Stormwater Ordinance 20% 0.93 0.89 12 0.18 14 <br /> P-red uction <br /> OM-1 Street Swee in 9.0 9.0 19 9.0 46 <br /> OM-2 Sum Manhole Cleanin 1.4 1.4 <br /> Total Obtained Ib/ r 67 35 88 67 257 <br /> Total R uired Ib r 35 31 152 12 230 <br /> Note:CIP-C#refers to mmpleted capital improvements <br /> Gty of Orono �Bonestmo Page 100 <br /> Surface Water Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.