My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
09-25-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:50 AM
Creation date
12/13/2018 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Minnesota State Rules Cha ter 8410 Re uirements ... <br /> lncluded Re uirement S ecifics Comments -MUSA Reference " <br /> _ Purpoae Purpose of Water based <br /> ro ams recreation areas <br /> Water Resource Include agreements and land ownership �� <br /> Management <br /> Related Fish and wildlife <br /> Agreements habitat, <br /> Executive management plans, <br /> Summary surveys <br /> Land snd Water All relevant data -MLCCS Data <br /> . Reeource on: <br /> ' Inventory . � -Biological Studies <br /> Precipitation _S�� <br /> Geology and Manasement Pians <br /> topographic data Unique features <br /> Surface water and scenic areas <br /> resaurces data <br /> -Public waters Pollutant sources , <br /> and ditches (landfitls, <br /> hazardous waste, <br /> -National feedlots,etc.) , <br /> Wetlands <br /> Inventory Map Safe Drinking <br /> -Functional Water Act <br /> values of Information* <br /> wetlands Patk&Open Space <br /> inventory or plen Inte ation• <br /> -Hydrologic <br /> characteristics of Easement <br /> public waters DedicationR <br /> table if provided Low Impact <br /> by DNR Develo ment" <br /> -Maps showing � <br /> areas served by Interest Conflicts" <br /> stormwater <br /> systems Stormwater Facility <br /> identifying ponds Ownership' <br /> ' and outfalls <br /> ' — Proliminary Plat <br /> -100-yr flood Develo menf' <br /> levels and peak "Su lements to 8410,MCWD Com rehensive Plan <br /> discharges of Establis6ment o[ Consistent with <br /> existing and policies and goals MCWD and <br /> proposed establish the <br /> stormwater ponds relation to local, <br /> and channels Aasesament of <br /> problems <br /> -Known flooding Corrective actions Nonstructural, <br /> problems <br /> Pro�rammatic,and <br /> -Flood insurance Structural <br /> studies Financial Cost of plan <br /> -Water quality cooaiderstion <br /> date and PCA, Implementation On the local level: <br /> DOT,etc. priorkiea ood <br /> information <br /> program <br /> -Monitoring sites <br /> Regulatory controls <br /> -Sarface water <br /> appropriations Design <br /> • Groundwater <br /> performance <br /> Data standards <br /> Soil data lnformation <br /> program <br /> Land use and <br /> Monitoring <br /> public utility program <br /> services <br /> -Existing Land <br /> Management <br /> program <br /> -Future Land Use Amendments to Procedure for <br /> Plan amendments <br /> A endix <br />
The URL can be used to link to this page
Your browser does not support the video tag.