My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
09-25-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:50 AM
Creation date
12/13/2018 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C . <br /> � <br /> ,..._--- <br /> . <br /> Table 9.3- 10-Year Phosphorus Reduction Plan <br /> Long Lake Creek <br /> Phosphorus Lake Painters <br /> Reduction(Ib/yr) Minnetonka Creek <br /> ID Activity Description Phosphorus Phosphorus Totals <br /> Upstream LOn9 Reduction Reduction <br /> of Long Lake to (�b/yr) (Ib/yr) <br /> Lake Tanager <br /> Lake <br /> CIP-C1 ��Offerman Ditch"Ravine 263 26.3 <br /> Stabilization <br /> Fox Street near western <br /> CIP-C2 terminus dry pond/ 0.7 0.7 <br /> infiltration <br /> CIP-C3 North Shore Drive and 0.7 0.7 <br /> Shad wood Road rain arden <br /> CIP-C4 Bracketts Pt. Road nd 0.7 0.7 <br /> Casco Point rain gardens, <br /> �p{5 sump manholes, restored 1.5 1.5 <br /> swale <br /> CIP-1 Stubbs Bay ravine 32 32 <br /> stabilization <br /> CIP-2 Stubbs Bay Wetland 15 15 <br /> Restoration <br /> CIP-3 Willow Drive Roadside BMPs 2•7 2•� <br /> Fox Street/Old Crystal Bay <br /> CIP-4 Road Ponding and 1.7 1.7 <br /> Conve ance Im rovements <br /> CIP-5 Orono Orchard Road 4.0 4 <br /> Roadside BMPs <br /> CIP-6 Long Lake Wetland 16 16 <br /> Restoration <br /> CIP-7 Long Lake Ravine 12 12 <br /> Stabilization <br /> West Lafayette Road <br /> CIP-8 Roadside BMPs and Water 1.6 1.6 <br /> uali Im rovemerrts <br /> CIP-9 Forest Lake Landing Water 0.38 0.38 <br /> uali Im rovements <br /> CIP-10 Old Crystal Bay Road 2 5 2.5 5 <br /> Roadside BMPs <br /> CIP-il Contributions to South 55 55 <br /> Katrina Marsh Im rovements <br /> CIP-12 Long Lake Creek Corridor 2� 20 <br /> Im rovements <br /> �_i Stormwater Ordinance 20% 0.93 0.89 12 0.18 14 <br /> P-reduction <br /> OM-1 Street Swee in 9.0 9.0 19 9.0 46 <br /> OM-2 Sum Manhole Cleanin 1.4 1.4 <br /> TotalObtained Ib/ r 67 35 88 67 257 <br /> Total R uired Ib r 35 31 152 12 230 <br /> Note:CIP-C#refers to completed capital improvemenks <br /> City of Orono �Bonestroo Page 100 <br /> Surface Water Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.