My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2018 Council Work Session Packet
Orono
>
City Council
>
2018
>
11-26-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:56:49 PM
Creation date
12/13/2018 9:47:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit C Utility Rates and Fees <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with <br />providing water and wastewater utility services to new customers to avoid placing these costs on existing customers. <br />The connection fee includes those portions of existing assets that will benefit new customers together with any <br />anticipated future capital improvements constructed for the purpose of providing utility services to new customers. <br />The connection charge applies to those properties not previously assessed for the associated utility project. <br />MUNICIPAL CONNECTION PERMIT <br />Sewer <br />$50.00 <br />SAC (Sewer Availability Charge) (MCES) <br />$2,485.00 <br />Water <br />$50.00 <br />Horn <br />Quote Basis <br />Mail in .,.-rage and haR dIiRg pcharg <br />09 <br />Connection inspection (Water or Sewer) <br />$100.00 <br />Disconnection inspection (Water or Sewer) <br />$100.00 <br />SEWER PROJECTS <br />Connection to existing City Sewer System: $5,100.00 $5,225.00 <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was <br />assessed) shall pay a prorated amount equivalent to the assessment residences were charged at the time of <br />the project: <br />Connection to Sewer System in adjacent city <br />Fee <br />2004 North Long Lake East Extension <br />$15,525.00 <br />2004 West Farm/Homestead <br />$9,315.00 <br />2005-1 Webber Hills/S Brown Rd Ext <br />$14,110.00 <br />2005-1 Dickey Lake Dr N <br />$18,000.00 <br />2006-1 Jamestown Road <br />$14,990.00 <br />2007 Farview Lane Sewer <br />$11,315.00 <br />Connection to Sewer System in adjacent city <br />WATER CONNECTIONS <br />Connection to existing City Water Main: $4,240 <br />Connection to Water system in adjacent city <br />Fee <br />$1,900.00 or per current Long <br />Connection to Long Lake Sewer System <br />Lake Fee Schedule <br />$1,000 or per current Wayzata <br />Connection to Wayzata Sewer System <br />Fee Schedule <br />WATER CONNECTIONS <br />Connection to existing City Water Main: $4,240 <br />Connection to Water system in adjacent city <br />Fee <br />$1,900.00 or per current Long <br />Connection to Long Lake Water System <br />Lake Fee Schedule <br />c"� $2,282.00 or per <br />Connection to Wayzata Water System <br />current Wayzata Fee Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.