My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00418 - sprinkler system
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3596 Shoreline Drive - 17-117-23-43-0107
>
Permits/Inspections
>
2016-00418 - sprinkler system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:42:47 PM
Creation date
12/12/2018 2:46:06 PM
Metadata
Fields
Template:
x Address Old
House Number
3596
Street Name
Shoreline
Street Type
Drive
Address
3596 Shoreline Drive
Document Type
Permits/Inspections
PIN
1711723430107
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATION <br /> � �i� <br /> � PNEUMATIC 0 ELECTRIC � HYDRAULIC _�_ � <br /> PIPING SUPERVISED 0 YES Q NO DETECTING MEDIA SUPERVISED �YES 0 NO I <br /> DELUGE ` <br /> DELUGE I <br /> &PREATION DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS 0 YES �NO I <br /> VALVES IS THERE AN ACCESSIBLE FACILITY IN EACH CURCUIT FOR TESTING IF NO EXPLAIN <br /> Q YES � NO <br /> MAKE MODEI_ DOES EACH CURCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE <br /> SUPERVISION LOSS ALARM OPERATE VALVE RELEASE RELEASE <br /> YES NO YES NO MINUTES SECONDS <br /> HYDROSTATIC: HYDROSTATIC TEST SHALL BE MADE AT NOT LESS THAN 200 PSI(13.6 BAR)FOR TWO HOURS OR 50 PSI(3.4 BAR)ABOVE <br /> STATIC PRESSURE IN EXCESS OF 150 PSI(102 BAR)FOR TWO HOURS. DIFFERENTIAL DRY-PIPE VALVE CLAPPERS SHALL BE LEFT OPEN DURING TEST TO <br /> TEST PREVENT DAMAGE. All ABOVEGROUND PIPING LEAKAGE SHALL BE STOPPED. <br /> DESCRIPTION PNEUMATIC: ESTABLISH 40 PSI(2.76AR)AIR PRESSURE AND MEASURE DROP WHICH SHALL NOT EXCEED 1-1/2 PSI(0.1 BAR)IN 24 HOURS. <br /> TEST PRESSURE TANKS AT NORMAL WATER LEVEL AND AIR PRESSURE AND MEASURE AIR PRESSURE DROP WHICH SHALL NOT EXCEED 1-1/2 PSI(0.1 BAR) <br /> IN 24 HOURS. <br /> ALL PIPING HYDROSTATICALLY TESTED AT PSI FOR HRS. IF N0,STATE REASON <br /> DRY PIPING PNEUMATICALLY TESTED 0 YES Q NO <br /> EQUIPMENT OPERATES PROPERLY Q YES 0 NO <br /> TESTS DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS,SODIUM SILICATE OR DERIVATIVES OR <br /> SODIUM SILICATES,BRINE,OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? <br /> � YES Q NO <br /> DRAIN TEST READING OF GAUGE LOCATED NEAR WATER SUPPLY TEST PIPE: RESIDUAL PRESSURE WITH VALVE IN TEST PIPE OPEN WIDE <br /> STATIC PRESSURE:�� PSI �� PSI <br /> UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFOR CONNECTION MADE TO SPRINKLER PIPING. <br /> VERIFIED BY COPY OF THE U FORM NO.858 0 YES � NO OTHER EXPLAIN: <br /> FLUSHED BYINSTALLATER OFUNDERGROUND 0 YES 0 NO <br /> SPRINKLER PIPING <br /> BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED <br /> GASKETS <br /> WELDED PIPING Q YES Q NO <br /> IF YES_. <br /> DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY �YES Q NO <br /> WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 <br /> WELDING <br /> DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED �YES �NO <br /> IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 <br /> DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A 0 YES �NO <br /> DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE <br /> RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER <br /> WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF <br /> PIPING ARE NOT PENETRATED. <br /> CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS �YES �NO <br /> (DISKS) (DISKS)ARE RETRIEVED . <br /> HYDRAULIC NAMEPLATE PROVIDED IF N0,EXPLAIN <br /> DATA <br /> NAMEPLATES �YES � NO <br /> REMARKS DATE LEFT IN SERVICE W ITH ALL CONTROL VALVE OPEN: <br /> , I <br /> NAME OF SPRINKLER CONTRACTOR: SUMMIT FIRE PROTECTION ! <br /> 1 <br /> SIGNATURES � '� '��> � <br /> /�l}�l F R ' . TY N�. TE b)Esse�sv TITLE� ( DATE: 1 ` � <br /> —�, � �`� r• �e. � "�c C.� �' /✓� G14� I <br /> S U M M I T R SP LER CQ /ACTOR(SIGNED) TITLE DATE: } '1 <br /> V � oc <br /> ♦ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.