Laserfiche WebLink
� Job:The Woofington Hydraulic Calculations <br /> PIPE INFORMATION <br /> Path No: 2 <br /> S1 10.5 5.6 24.5 1 9 120 19.1 <br /> S2 10.5 5.6 24.5 1.104 0 0.1467 0 <br /> 9 1.3 <br /> S2 10.5 5.6 25.3 1.25 9 120 20.4 <br /> S3 10.5 5.6 49.7 1.452 0 0.1439 0 <br /> 9 1.3 <br /> S3 10.5 5.6 26.1 1.5 lx(VIC.TEE-Br)=10.04 3.54 120 21.7 <br /> 278 10.5 75.8 1.687 10.04 0.1513 0 <br /> 13.58 2.1 <br /> 278 10.5 51.4 1.5 lx(VIC.TEE-Br)=10.04 0.75 120 23.7 <br /> 276 9.75 127.2 1.687 10.04 0.3943 0.3 <br /> 10.79 4.3 <br /> 276 9.75 0 2.5 13.33 120 28.3 <br /> 008 9.75 127.2 2.703 0 0.0397 0 <br /> Y3.33 0.5 <br /> 008 2g.9 <br /> Path No: 3 <br /> S10 10.5 5.6 25.4 1.5 lx(VIC.TEE-Br)=10.04 5.79 120 20.6 <br /> 003 10.5 73.8 1.687 10.04 0.1439 0 <br /> 15.84 2.3 <br /> 003 22.9 <br /> Path No: 4 <br /> S4 10.5 5.6 26.1 1.25 lx(VIC.TEE-Br)=7.69 5.46 120 21.7 <br /> 278 10.5 51.4 1.452 7.69 0.1527 0 <br /> 13.15 2 <br /> 278 23.7 <br /> Path No: 5 <br /> S6 10.5 5.6 23.5 1 lx(VIC.TEE-Br)=6.41 9.74 120 17.6 <br /> 002 10.5 23.5 1.1041x(VIC.90)=2.57 8.98 0.136 0 <br /> 18.72 2.5 <br /> 002 10.5 24.9 1.25 3.51 120 20.1 <br /> S10 10.5 5.6 48.4 1.452 0 0.1366 0 <br /> 3.51 0.5 <br /> S 10 20.6 <br /> Path No: 6 <br /> S5 10.5 5.6 25.3 1 9 120 20.3 <br /> S4 10.5 5.6 25.3 1.104 0 0.1557 0 <br /> 9 1.4 <br /> S4 21.7 <br /> Path No: 7 <br /> S11 10.5 5.6 24.9 1 2.41 120 19.8 <br /> 002 10.5 24.9 1.104 0 0.1516 0 <br /> 2.41 0.4 <br /> 002 20.1 <br /> File:O:\Projects�2130-370491 The Woofington\Design\CFSP\The Woofington-submit.dwg <br /> Date 4/22/2016 Copyright�2002-2012 Tyco Fire Protection Products Page 9 <br />