My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00782 - plumbing
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3596 Shoreline Drive - 17-117-23-43-0107
>
Permits/Inspections
>
2014-00782 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:42:45 PM
Creation date
12/12/2018 2:44:33 PM
Metadata
Fields
Template:
x Address Old
House Number
3596
Street Name
Shoreline
Street Type
Drive
Address
3596 Shoreline Drive
Document Type
Permits/Inspections
PIN
1711723430107
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laurens Salon Suite B <br /> Plumbing <br /> Plan No. PLB 1406-00019 <br /> Page 2 <br /> July l7, 2014 <br /> 4. A steam generator must have an approved high-hazard backflow preventer installed on its water supply(see <br /> Minnesota Rules,part 4715.2100). Since the possibility of back pressure exists,an RPZ backflow preventer <br /> must be installed. <br /> 5. It is recommended that a cleanout be provided where new waste and vent piping connects with existing <br /> plumbing to facilitate required testing of the new installation. <br /> 6. Verify that the existing water supply and waste systems are sized to accommodate the added fixtures(see <br /> Minnesota Rules,part 4715.3800 and part 4715.2310). <br /> 7. Showers and combination showers-baths shall be equipped with individual thermostatic, pressure balancing, <br /> or combination thermostatic and pressure-balancing control valves in accordance with ASSE 1016(see <br /> Minnesota Rules,part 4715.1380, subpart 5). The m�imum temperature setting must be set or adjusted in <br /> accordance with the standard and should not exceed 110 degrees F. <br /> 8. Valves shall be installed permitting the water supply to each room or individual fixture to be shut offwithout <br /> disrupting any other portion of the building(see Minnesota Rules,part 4715.1800, subpart 6). <br /> 9. Pipe hangers and supports shall comply with Minnesota Rules, part 4715.1430. <br /> 10. Plastic pipe must be installed in accordance with Minnesota Rules, part 4715.0550 through part 4715.0600. <br /> Above-grade horizontal runs cannot exceed 35 feet in total length. <br /> 11. Cross-link polyethylene(PEX)tubing must meet Minnesota Rules,part 4715.0520: <br /> a. The tubing system must comply with ASTM F877 and F876. <br /> b. When installed as a system in accordance with ASTM F877,the system tubing and fittings must be of <br /> the same manufacturer and be marked as required. <br /> c. When not installed as a system,the fittings must be marked with ASTM F1807,F1960, F2080, <br /> F2098-01,or F2159. The tubing must list the fitting and tubing standard. <br /> d. Installers must be factory trained and possess a card documenting completion of training. <br /> 12. The water distribution system shall be disinfected per Minnesota Rules,part 4715.2250. <br /> 13. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. <br /> NOTE(S): <br /> 1. The scope of this project consists of remodeling an existing building. Installation includes a floor drain,a <br /> shower vaive, a steam generator,a hand sink,and two pedicure spas. <br /> 2. The building is served by existing municipal sewer and water services. <br /> 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the <br /> plans may use the plans for construction. If another plumber is contracted to install the plumbing,they must <br /> submit their own plans and specifications for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.