Laserfiche WebLink
Lyle Oman <br /> From: info@seidouspa.com <br /> Sent: Friday, October 17, 2014 11:10 AM <br /> To: Lyle Oman; Andrew Mack <br /> Cc: paul@goapluscc.com; info@seidouspa.com; winnesplumbing@gmail.com <br /> Subject: cancelling the building permit of 3596 Shoreline Drive <br /> Andrew& Lyle, <br /> This letter is inform you that I am going to void the contract with the city for the restaurant and salon. With that said, <br /> Mike will no longer doing the plumbing for the salon. All my contractor has been cancelled and if you had issues with <br /> their liability and workmen comp. They are listed on the website of the Dept. of Labor. <br /> Paul and I had a verbal agreement since last year about the building and to date, Paul has not signed commercial lease <br /> with me. <br /> I have accommodated all the changes in the process. <br /> 1. Suppose to be 3200 sq.feet to 2900 sq. feet. <br /> 2. Harassing my contactors <br /> 3. Changing the layout of the building...over and over <br /> 4. Removal of the exteriors awning and Ip siding and the processing of painting-- <br /> 5. All the permits, engineering and Artectical fee's <br /> 6. As a tenant I can do any color, design, lightening to the place to improve the building but you had people <br /> interfere with even the colors of my salon <br /> 7. I have helped you out financially through-out the year. <br /> You even want me to bring up the electrical code and the heating and A/C for the building. Beside the fire sprinklers for <br /> the building. The improvement cost allowance of 45K, that I was supposed to take in rent and installments in November <br /> has been moved a few times because after speaking with your contractor Tom and Eric that it's the building owner <br /> responsibility for the sprinkler system. So your improvement cost to my space is going to code issues and you want me <br /> to pay for these. <br /> All the improvements so far has been 30-40K which has come out of my pocket and you have not put a dime into your <br /> building. Except to complain about the dusts,garbage, and harassed my contractor's. <br /> I am pulling out and walking away from everything. I have my materials in the building that I will like to move to get <br /> credit, since I bought them. Before I made this decision, I thought we had iron all this out Sunday but because we didn't <br /> meet to do more talking you told your guys, I broke the contract and told me to get out. Not you telling me but the <br /> people you hired. If you are not going to work with me in letting me in the building to take the remaining of the <br /> materials. I will go to the police and they can help escort me. I will return the key to you then as well. <br /> Lauren <br /> 1 <br /> l <br />