Laserfiche WebLink
Sewer Fund <br />In recent years, the sewer fund has mostly operated at a loss. Non-operating revenues however, have <br />consistently offset the operating losses. This has resulted in a positive operating cash flow for the <br />fund. <br />The single largest expense for the sewer fund is the Met Council disposal charges. The three years <br />have seen increases in the amounts of $37,410 (9.5%), $41,277 (9.6%) and $123,425 (28.6) <br />respectively. This is a 40% increase in three years. As has been discussed with the Council during <br />previous budget processes, heavy rains and high water tables increase the flow through the MCES <br />lift stations and increase our disposal charges. <br />The total operating expenditure budget is increasing by $213,675 (15.2%) The major increases are <br />the previously mentioned MCES charges ($123,425), repairs and maintenance for sewer lines <br />($57,280) and the Administrative Charge ($70,660). The operating transfer is to cover the sewer <br />improvements that were part of the Casco Point project and will continue for another five years. <br />Upcoming capital expenditures can be covered by the fund's current cash balances. Projects <br />identified in the CIP for 2019 include: Annual sewer rehabilitation ($281,377), Sewer televising <br />($48,690), additional generators ($150,000), lift station updates ($116,000); lift station monitoring <br />improvements ($26,000), sewer main replacements ($198,000), and a generator rehabilitation <br />($10,000), for a total of $820,068. The current cash balance for the fund is $2,426,737. <br />Storm Water <br />The Stormwater Fund is for the most part project based. Operating expenditures are mainly limited <br />to engineering associated with NPDES, SWPPP and other state and federal requirements. Public <br />Works time and materials spent on culvert cleaning/replacement are also charged to this fund. The <br />purpose of this fund is to collect money for the larger Stormwater projects that will be required in the <br />future. The attached five-year projection assumes a 10% annual increase. <br />Potential CIP projects in 2019 include: Watershed Delineation and Pond Assessments ($10,000), <br />Forest Arms Lane ($69,324), East Long Lake S ($63,515), Tonkaview Lane ($87,531), Chevy Chase <br />Drive ($146,330), East long Lake Road N ($82,000), Storm Sewer Improvements ($200,000), TMDL <br />Updates ($50,000), and OCB pipe upsizing (88,500). The capital expenditures total $798,200. The <br />funds current cash balance is $1,775,011. <br />Recycling <br />The recycling fund was newly created in 2013. Its major expenditure line is for contracted <br />recycling charges. The current contract with Waste Management is increasing 2.5% increase. The <br />Recycled Materials offset that the City was receiving in 2017 has not been being paid in 2018. The <br />offset is based on the market for recycled materials which weakened it 2018. The full time wages <br />that are charged to the fund represent 10% of the City Clerks wages. The current cash balance is <br />$32,436. <br />