My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Work Session Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:48:38 PM
Creation date
12/12/2018 11:23:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />Street Address:Mailing ,Address: iele,ohone (952)249-4604 <br />2750 Kelley Parkway 1?a. Box 66 Fax (952) 249-4616 <br />ly Orono, MN 55356 Crystal Bay, MN 55323 www.d.ar©no.rnn.us <br />March 19, 2018 <br />Bruce Paddock <br />155 Lake Street E <br />Suite 2000 <br />Wayzata, MN 55391 <br />Mark and Laurie Headrick <br />1480 Bracketts Point Road <br />Wayzata, MN 55391 <br />Re: Transition of Bracketts Point road from private to public <br />Mr. Paddock, Mr. and Mrs. Headrick, <br />We have received your request to transfer the private portion of Bracketts Point Road to a public street. Upon <br />such requests, city staff reviews the geometry of the road and right of way, condition of the road and reports its <br />findings to the Council for their review. The Council's review is scheduled for Monday, April 9th. You or an <br />agent should plan on being present. An agenda and staff report will be available on Friday, April 6th <br />Staffs findings include: <br />1. Geometry. The geometry of the roadway does not meet current city standards <br />a. The pavement is 20 feet wide with curb where the current standard is 28 feet. <br />b. The right of way is 30 ft where a local public road right of way should be 50 ft. <br />c. The Cul -de -Sac Right of way is a 45 ft radius where a 50 ft radius is required. <br />d. We note the Northern portion of Brackets Point Road, which is public has 21ft wide pavement <br />and sits in a 40ft ROW easement. <br />2. Based on the plan set from the construction of the road it appears the road profile (thickness and material <br />types) is consistent with current public road standards. <br />3. Maintenance. The segment is approximately 540 ft long. The pavement is 10 years old. <br />a. Its addition to the winter maintenance program would not be significant. <br />b. The addition of this pavement to the City Pavement Management Plan will cost <br />approximately $157,000 over the life of the road. This assumes 4 chip seals, two overlays and a <br />reconstruction over the next 40 years in today's $s. <br />4. Condition. <br />a. The road is in good condition with little evidence of pavement surface distress. <br />b. It does not appear that any preventive maintenance activities have taken place. <br />c. The road does have curb and gutter which appears to be in good condition. <br />5. Considerations. If this road segment does become public: <br />a. Staff recommends current owner to chip seal the surface prior to transfer. <br />b. The stormwater easements / maintenance responsibilities will need to be adjusted. The city <br />would take on maintenance of the portion within the street ROW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.