My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: plmb plans
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3502 Shoreline Drive - 17-117-23-43-0114
>
Correspondence
>
Re: plmb plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:42:52 PM
Creation date
12/12/2018 10:27:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3502
Street Name
Shoreline
Street Type
Drive
Address
3502 Shoreline Drive
Document Type
Correspondence
PIN
1711723430114
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_� � <br /> Salon <br /> Plumbing <br /> Plan No.PLB 1403-00086 <br /> PAGE 3 <br /> 4/13/2010 <br /> 9. PVC plastic pipe used for the drain,waste,and vent system shall comply��ith ASTM Standard D2665, <br /> D2949 or F891 (see Minnesota Rules,part 47 t 5.0570 through part 4715.0600). Solvent weld joints in PVC <br /> and CPVC pipe must include use of a primer which is of contrasting color to the pipe and cement. A one- <br /> step solvent cement complying�vifh ASTM Standard F493 or D2846 may be used for CPVC joints(see <br /> Minnesota Rules,part 4715.0810,subpart 2}. <br /> 10. The plumbing system shall Ue tested in accordance with Minnesota Rules,part 4715.2820. <br /> 11. The water distribution system shall be disinfected in accordance with Minnesota Rules,part 4715.2250. <br /> NOTE(S): <br /> 1. The scope of this project consists of tke remodelling of an exisEing building. The plumbing installation <br /> inctudes hvo hair�vash sinks and hvo pedicure sinks. <br /> 2. This facitity will be served by existing municipal water and se�ver service connections. <br /> Authorization for construction in accoidance wath the approved plans may be�vithdrawn if construction is not <br /> undertaken within a peiiod of two years. The fact that the plans l�ave been approved does not necessarily meaii that <br /> recommendations or reyuirements fox change will not be made at some later time when changed conditions, <br /> additional information,or advanced knowledge make improvements necessary. <br /> Approved: <br /> � <..��lP C�����-.-- <br /> � � <br /> Bradley C.Erickson <br /> Public Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 651/284-5880 <br /> cc: Dolder Plumbing&Heating LLC <br /> L-N-R Properties <br />
The URL can be used to link to this page
Your browser does not support the video tag.