My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01166 - plumbing
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3435 Shoreline Drive - Navarre Lanes/The Crib
>
Permits/Inspections
>
2015-01166 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
12/6/2018 2:40:45 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1• . <br /> 1 � <br /> CAPTAIN PLUMBING <br /> PROFESSIONAL PLUMBING SERVICES <br /> ROBERT MEIER 060'118-PM 7307 COUNTY ROAD 5 PRINCETON,MN 55371 <br /> 763 355 8462 <br /> ATT: To Whom it may concem <br /> City of�rono Inspection Dept. <br /> Project: Plumbing 2 restrooms replumbing 3435 Shoreline Dr Orono NIN <br /> We will be providing all repairs and modifications to waste,vent,waterPiPing as oode requires in an <br /> existing building for installing new 2 ADA toilets and 2 ADA lavatories and the capping in wall of water <br /> lines and vvaste of old sinks and toilets to make the new configuration on the included plan. A <br /> service/washtub type sink and a SO gallon electric water heater will also be added in in an adjacent <br /> location to the existing restrooms. There is no new utility service connections,no roof drain additions,or <br /> no other plumbing alteradons in any other part of the building. All cement demo and replacement to be <br /> done by others,all other work such as wall building and finishing,installation of doors,etc.to be done by <br /> others. <br /> All drains,waste,and vent modificarions to be schedvle 40 PVC,ASTM F-891-00 with solvent weld glue <br /> joints. Existing waste and vent piping will be capped,modified,and added to plumb the project in the <br /> new oonfiguration <br /> New water pipe materials to be type M oopper,NSF-61 with solcler type connections,Uponor Wirsbo <br /> Aquapex ASTM F877,ASTM F1960.The exisring water connections will be cap�ed,modified,anci added <br /> to plumb the project in the new canfiguration. <br /> Toilets to be Kohler K-4368 top spud ADA,toilet flushometer Sloan 111 or equiv.,lavatories Ge�er 12- <br /> 834 or equiv.,lav faucet Delta DSOIHDF or equiv. Water heater Bradford Wlute 50 gal electric Model# <br /> RE350S6-1NCWW,or equiv. Service sink Mustee utilatub#18 or equiv.with faucet Moen 74998 or <br /> equiv. <br /> Thank you for you ent� <br /> � <br /> -Robert A. eier, ce11763 3 8462 <br />
The URL can be used to link to this page
Your browser does not support the video tag.