Laserfiche WebLink
� � �� t�ETERMINFNG PERMIT FEES � ���� �� <br /> ❑SAC Charge(2015 Rate=$2,485.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono Ciry Staff can determine if applicable) <br /> (if not prepaid,a sewer connection permit will not be issued) <br /> ❑Sewer Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; cast iron <br /> ❑X Water Connection/Disconnect/Repair($50.00/Per Stub) $ 50.00 <br /> Pipe size�inches;materialductile Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Waler Connection Permit is Issued: <br /> 1. Issue Water Meter&�Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ 50.00 <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ -�:�-� <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ �—' ��. OZ� <br /> ADDITIONAL INFORMATION—WATE& METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate pennit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit,agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are,true and correct. <br /> 7 ; <br /> Applicant: Date: si2i�s <br />